Install EV Chargers in Woodland, California

Install EV chargers or analyze a site in Woodland, California. 35 existing public charging locations (10 DC fast, 25 Level 2). Free 0–100 profitability score on any Woodland address from EV Data Map by Charge Rigs.

Woodland, California is served by 35 public electric vehicle charging locations operating 138 individual chargers — an average of 3.9 chargers per site. Of those locations, 10 (29%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Woodland is ChargePoint Network with 14 locations, followed by Non-Networked with 7. Average DC fast power across the city is approximately 161 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Woodland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Woodland

Woodland, California, stands out in its public EV charging landscape with a diverse array of 35 locations serviced by 10 distinct charging operators, including a notable 40% of sites managed by ChargePoint Network. This variety fosters competitive pricing and uptime, allowing drivers to choose based on power and amenities rather than brand loyalty. The city boasts an impressive average DC fast charging power of 161 kW, with 40% of these stations exceeding 150 kW-class capability, making it attractive for EV users seeking quick top-ups. With 70 DC fast ports available and a strong focus on both fast and Level 2 charging options, Woodland presents a well-equipped environment for current and prospective EV drivers navigating the region.

Woodland charging by the numbers

Locations
35
Chargers
138
DC Fast locations
10
Level 2 locations
25

DC fast share: 29% of locations. Level 2 share: 71%. Average chargers per site: 3.9. Average DC fast power: 161 kW.

Woodland charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 10 networks.
Average DC fast power
161 kW (fastest stall: 325 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
29% DC fast / 71% Level 2 across 35 locations
Estimated DC ports
70 fast-charging ports city-wide

Charging networks in Woodland

The following operators run public charging in Woodland, ranked by number of locations.

Featured charging locations in Woodland

A selection of higher-power public charging locations across Woodland, sorted by power level.

  1. Gibson Plaza - Tesla Supercharger — Woodland, CA, 95776 (Tesla · DC Fast · 325 kW)
  2. Target - Tesla Supercharger — Woodland, CA, 95776 (Tesla · DC Fast · 250 kW)
  3. County Fair Fashion Mall — Woodland, CA, 95776 (eVgo Network · DC Fast · 200 kW)
  4. 7Charge - Woodland 41143 — Woodland, CA, 95776 (7CHARGE · DC Fast · 180 kW)
  5. Woodland Ford — Woodland, CA, 95776 (FORD_CHARGE · DC Fast · 120 kW)
  6. MOTEL 6 Woodland — Woodland, CA, 95776 (EVGATEWAY · DC Fast · 120 kW)
  7. VALLEY OAKS — Woodland, CA, 95776 (EVGATEWAY · DC Fast · 120 kW)
  8. Hampton INN — Woodland, CA, 95776 (EVGATEWAY · DC Fast · 120 kW)
  9. Quality INN Woodland — Woodland, CA, 95776 (EVGATEWAY · DC Fast · 120 kW)
  10. Takhar Properties — Woodland, CA, 95695 (Non-Networked · DC Fast · 50 kW)
  11. 250 Buckeye Street — Woodland, CA, 95695 (LOOP · Level 2 · 7.7 kW)
  12. The Boulevard Apartments — Woodland, CA, 91364 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Woodland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Woodland, California?
There are 35 public electric vehicle charging locations in Woodland, California, with a combined 138 individual chargers. 10 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Woodland?
ChargePoint Network operates the most public charging locations in Woodland with 14 sites, followed by Non-Networked with 7 sites.
How much does it cost to install an EV charger in Woodland?
Level 2 EV chargers in Woodland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Woodland?
Most Woodland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Woodland?
A typical commercial Level 2 installation in Woodland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Woodland take to become profitable?
Payback in Woodland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage