Install EV Chargers in Vallejo, California

Install EV chargers or analyze a site in Vallejo, California. 35 existing public charging locations (9 DC fast, 25 Level 2). Free 0–100 profitability score on any Vallejo address from EV Data Map by Charge Rigs.

Vallejo, California is served by 35 public electric vehicle charging locations operating 121 individual chargers — an average of 3.5 chargers per site. Of those locations, 9 (26%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (71%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Vallejo is ChargePoint Network with 26 locations, followed by Tesla with 4. Average DC fast power across the city is approximately 194 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Vallejo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Vallejo

Vallejo stands out in the EV charging landscape with a robust concentration of ChargePoint Network locations, which constitute 74% of the city’s 35 public charging sites. This dependency on a single operator enhances operational reliability, essential for potential site developers considering entry into the market. The presence of nine DC fast charging locations, averaging 194 kW—well-supported by 56% of those sites rated 150 kW or higher—highlights Vallejo's commitment to high-power charging infrastructure. With around 73 DC fast ports available, the balance between fast and Level 2 charging equips the area to meet diverse driver needs, making it a target for further development opportunities.

Vallejo charging by the numbers

Locations
35
Chargers
121
DC Fast locations
9
Level 2 locations
25

DC fast share: 26% of locations. Level 2 share: 71%. Average chargers per site: 3.5. Average DC fast power: 194 kW.

Vallejo charging — local snapshot

Top operator share
ChargePoint Network runs 74% of public locations across 6 networks.
Average DC fast power
194 kW (fastest stall: 350 kW)
High-power share
56% of DC fast sites are 150 kW-class or higher
Mix
26% DC fast / 74% Level 2 across 35 locations
Estimated DC ports
73 fast-charging ports city-wide

Charging networks in Vallejo

The following operators run public charging in Vallejo, ranked by number of locations.

Featured charging locations in Vallejo

A selection of higher-power public charging locations across Vallejo, sorted by power level.

  1. Springstowne Center — Vallejo, CA, 94591 (eVgo Network · DC Fast · 350 kW)
  2. Gateway Plaza - Tesla Supercharger — Vallejo, CA, 94591 (Tesla · DC Fast · 325 kW)
  3. Solano 80 Shopping Center - Tesla Supercharger — Vallejo, CA, 94590 (Tesla · DC Fast · 250 kW)
  4. Safeway - Tesla Supercharger — Vallejo, CA, 94591 (Tesla · DC Fast · 250 kW)
  5. Target - Tesla Supercharger — Vallejo, CA, 94591 (Tesla · DC Fast · 150 kW)
  6. H&S ENERGY H&S 3060 — Vallejo, CA, 94590 (ChargePoint Network · DC Fast · 125 kW)
  7. H&S ENERGY H&S 3060.4 — Vallejo, CA, 94590 (ChargePoint Network · DC Fast · 125 kW)
  8. H&S ENERGY H&S 3060.2 — Vallejo, CA, 94590 (ChargePoint Network · DC Fast · 125 kW)
  9. Vallejo Downtown Parking Lot J — Vallejo, CA, 94590 (EVCS · DC Fast · 50 kW)
  10. SecureSpace Self Storage Vallejo — Vallejo, CA, 94591 (Blink Network · Level 2 · 10.4 kW)
  11. Vallejo City Hall — Vallejo, CA, 94590 (Non-Networked · Level 2 · 7.2 kW)
  12. CAL MARITIME CHARGER # 11&12 — Vallejo, CA, 94590 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Vallejo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Vallejo, California?
There are 35 public electric vehicle charging locations in Vallejo, California, with a combined 121 individual chargers. 9 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Vallejo?
ChargePoint Network operates the most public charging locations in Vallejo with 26 sites, followed by Tesla with 4 sites.
How much does it cost to install an EV charger in Vallejo?
Level 2 EV chargers in Vallejo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Vallejo?
Most Vallejo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Vallejo?
A typical commercial Level 2 installation in Vallejo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Vallejo take to become profitable?
Payback in Vallejo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage