Install EV Chargers in Carbondale, Colorado

Install EV chargers or analyze a site in Carbondale, Colorado. 19 existing public charging locations (1 DC fast, 18 Level 2). Free 0–100 profitability score on any Carbondale address from EV Data Map by Charge Rigs.

Carbondale, Colorado is served by 19 public electric vehicle charging locations operating 40 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (5%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carbondale is ChargePoint Network with 11 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carbondale and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carbondale

Carbondale boasts a competitive EV charging ecosystem with 19 public locations across six distinct operators, led by ChargePoint Network, which comprises 58% of the sites. This variety ensures competitive pricing and uptime while allowing drivers to choose based on specific charging needs, as the lone DC fast charger offers a modest average of 63 kW. Notably, the absence of higher-capacity DC fast options signals an opportunity for new providers to enter the market with advanced 150-350 kW units, further enhancing the town's appeal for EV drivers. Meanwhile, the predominant Level 2 chargers cater effectively to longer dwell times, making Carbondale an intriguing landscape for further charging infrastructure development.

Carbondale charging by the numbers

Locations
19
Chargers
40
DC Fast locations
1
Level 2 locations
18

DC fast share: 5% of locations. Level 2 share: 95%. Average chargers per site: 2.1. Average DC fast power: 63 kW.

Carbondale charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 6 networks.
Average DC fast power
63 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
5% DC fast / 95% Level 2 across 19 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Carbondale

The following operators run public charging in Carbondale, ranked by number of locations.

Featured charging locations in Carbondale

A selection of higher-power public charging locations across Carbondale, sorted by power level.

  1. COWEN DRIVE DC 1 — Carbondale, CO, 81623 (ChargePoint Network · DC Fast · 62.5 kW)
  2. Budget Blinds of the High Country — Carbondale, CO, 81623 (EVMATCH · Level 2 · 19.2 kW)
  3. COWEN DRIVE TH PUBLIC 1N — Carbondale, CO, 81623 (ChargePoint Network · Level 2 · 19.2 kW)
  4. Builders FirstSource — Carbondale, CO, 81623 (Blink Network · Level 2 · 16.6 kW)
  5. COWEN DRIVE TH PUBLIC 1S — Carbondale, CO, 81621 (ChargePoint Network · Level 2 · 9.6 kW)
  6. Colorado Mountain College - Carbondale — Carbondale, CO, 81623 (Non-Networked · Level 2 · 7.2 kW)
  7. Roaring Fork High School — Carbondale, CO, 81623 (Non-Networked · Level 2 · 7.2 kW)
  8. Third Street Center — Carbondale, CO, 81623 (AMPUP · Level 2 · 7.2 kW)
  9. Town of Carbondale - Town Hall — Carbondale, CO, 81623 (Non-Networked · Level 2 · 7.2 kW)
  10. Marble Distilling Company - Tesla Destination — Carbondale, CO, 81623 (Tesla Destination · Level 2 · 7.2 kW)
  11. RMS EV 1 — Carbondale, CO, 81623 (ChargePoint Network · Level 2 · 6.5 kW)
  12. COMNTCO CARBONDALE S1 — Carbondale, CO, 81623 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carbondale specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carbondale, Colorado?
There are 19 public electric vehicle charging locations in Carbondale, Colorado, with a combined 40 individual chargers. 1 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Carbondale?
ChargePoint Network operates the most public charging locations in Carbondale with 11 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Carbondale?
Level 2 EV chargers in Carbondale typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carbondale?
Most Carbondale projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carbondale?
A typical commercial Level 2 installation in Carbondale energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carbondale take to become profitable?
Payback in Carbondale depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.