Install EV chargers or analyze a site in Glenwood Springs, Colorado. 29 existing public charging locations (6 DC fast, 23 Level 2). Free 0–100 profitability score on any Glenwood Springs address from EV Data Map by Charge Rigs.
Glenwood Springs, Colorado is served by 29 public electric vehicle charging locations operating 59 individual chargers — an average of 2.0 chargers per site. Of those locations, 6 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 23 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Glenwood Springs is ChargePoint Network with 19 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 212 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Glenwood Springs and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Glenwood Springs
In Glenwood Springs, Colorado, the EV charging landscape is significantly shaped by ChargePoint Network, which operates 66% of the city’s 29 public charging locations. This concentration of charging sites ensures that uptime and network reliability are closely tied to a single operator, making it a crucial factor for potential competitors. With six DC fast charging locations averaging 212 kW and featuring 83% of fast chargers at 150 kW-class or higher, the area offers an appealing charging experience for drivers. These ultra-fast options, complemented by 23 Level 2 chargers, create a balanced ecosystem that caters to both rapid and longer-stay needs, providing valuable insights for site development opportunities in the region.
Glenwood Springs charging by the numbers
Locations
29
Chargers
59
DC Fast locations
6
Level 2 locations
23
DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 2.0. Average DC fast power: 212 kW.
Glenwood Springs charging — local snapshot
Top operator share
ChargePoint Network runs 66% of public locations across 7 networks.
Average DC fast power
212 kW (fastest stall: 350 kW)
High-power share
83% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 29 locations
Estimated DC ports
14 fast-charging ports city-wide
Charging networks in Glenwood Springs
The following operators run public charging in Glenwood Springs, ranked by number of locations.
ChargePoint Network — 19 locations
Non-Networked — 3 locations
EVMATCH — 2 locations
VIALYNK — 2 locations
Tesla — 1 location
Blink Network — 1 location
Electrify America — 1 location
Featured charging locations in Glenwood Springs
A selection of higher-power public charging locations across Glenwood Springs, sorted by power level.
Target T2029 (Glenwood Springs, CO) — Glenwood Springs, CO, 81601 (Electrify America · DC Fast · 350 kW)
VOLVO CAR USA GW SPRINGS PL2 — Glenwood Springs, CO, 81601 (ChargePoint Network · DC Fast · 200 kW)
VOLVO CAR USA GW SPRINGS PL4 — Glenwood Springs, CO, 81601 (ChargePoint Network · DC Fast · 200 kW)
VOLVO CAR USA GW SPRINGS PL3 — Glenwood Springs, CO, 81601 (ChargePoint Network · DC Fast · 200 kW)
VOLVO CAR USA GW SPRINGS PL1 — Glenwood Springs, CO, 81601 (ChargePoint Network · DC Fast · 200 kW)
Residence Inn Glenwood Springs - Tesla Supercharger — Glenwood Springs, CO, 81601 (Tesla · DC Fast · 120 kW)
8th and Pitkin — Glenwood Springs, CO, 81601 (VIALYNK · Level 2 · 19.2 kW)
8th and Pitkin — Glenwood Springs, CO, 81601 (VIALYNK · Level 2 · 19.2 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Glenwood Springs specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 23 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Glenwood Springs, Colorado?
There are 29 public electric vehicle charging locations in Glenwood Springs, Colorado, with a combined 59 individual chargers. 6 locations offer DC fast charging and 23 provide Level 2 charging.
What is the largest EV charging network in Glenwood Springs?
ChargePoint Network operates the most public charging locations in Glenwood Springs with 19 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Glenwood Springs?
Level 2 EV chargers in Glenwood Springs typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Glenwood Springs?
Most Glenwood Springs projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Glenwood Springs?
A typical commercial Level 2 installation in Glenwood Springs energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Glenwood Springs take to become profitable?
Payback in Glenwood Springs depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.