Install EV Chargers in Durango, Colorado

Install EV chargers or analyze a site in Durango, Colorado. 43 existing public charging locations (7 DC fast, 36 Level 2). Free 0–100 profitability score on any Durango address from EV Data Map by Charge Rigs.

Durango, Colorado is served by 43 public electric vehicle charging locations operating 96 individual chargers — an average of 2.2 chargers per site. Of those locations, 7 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 36 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Durango is ChargePoint Network with 37 locations, followed by RIVIAN_ADVENTURE with 1. Average DC fast power across the city is approximately 238 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Durango and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Durango

In Durango, Colorado, electric vehicle charging is heavily centered around the ChargePoint Network, which operates 86% of the city's 43 public locations, creating a reliability advantage for drivers. With 7 DC fast charging stations boasting an impressive average power output of 238 kW—peaking at 325 kW—this area is well-equipped for quick top-ups, making it attractive for longer trips through the scenic Rockies. The fact that all DC fast sites exceed 150 kW ensures they cater to the growing demand for ultra-fast charging options. This distinct power profile and network concentration should influence competing site developers, as opportunities exist to address both quick charging needs and the longer dwell times of Level 2 demand throughout Durango and its surroundings.

Durango charging by the numbers

Locations
43
Chargers
96
DC Fast locations
7
Level 2 locations
36

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 2.2. Average DC fast power: 238 kW.

Durango charging — local snapshot

Top operator share
ChargePoint Network runs 86% of public locations across 7 networks.
Average DC fast power
238 kW (fastest stall: 325 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 43 locations
Estimated DC ports
24 fast-charging ports city-wide

Charging networks in Durango

The following operators run public charging in Durango, ranked by number of locations.

Featured charging locations in Durango

A selection of higher-power public charging locations across Durango, sorted by power level.

  1. Durango Transit Center - Tesla Supercharger — Durango, CO, 81301 (Tesla · DC Fast · 325 kW)
  2. Durango, CO — Durango, CO, 81303 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Durango Ford — Durango, CO, 81301 (FORD_CHARGE · DC Fast · 240 kW)
  4. CITY OF DURANGO TC-DCFC-1 — Durango, CO, 81301 (ChargePoint Network · DC Fast · 200 kW)
  5. PURGATORY PURGATORY PL1 — Durango, CO, 81301 (ChargePoint Network · DC Fast · 200 kW)
  6. PURGATORY PURGATORY PL2 — Durango, CO, 81301 (ChargePoint Network · DC Fast · 200 kW)
  7. CITY OF DURANGO TC-DCFC-2 — Durango, CO, 81301 (ChargePoint Network · DC Fast · 200 kW)
  8. CITY OF DURANGO TC-3 — Durango, CO, 81301 (ChargePoint Network · Level 2 · 19.2 kW)
  9. DFPD ST 2 DFPD STATION 2 — Durango, CO, 81301 (ChargePoint Network · Level 2 · 19.2 kW)
  10. HOSPITAL MERCY HEALTH 5 — Durango, CO, 81301 (ChargePoint Network · Level 2 · 9.6 kW)
  11. CITY OF DURANGO TC-4 — Durango, CO, 81301 (ChargePoint Network · Level 2 · 9.6 kW)
  12. HOSPITAL MERCY HEALTH 3 — Durango, CO, 81301 (ChargePoint Network · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Durango specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 36 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Durango, Colorado?
There are 43 public electric vehicle charging locations in Durango, Colorado, with a combined 96 individual chargers. 7 locations offer DC fast charging and 36 provide Level 2 charging.
What is the largest EV charging network in Durango?
ChargePoint Network operates the most public charging locations in Durango with 37 sites, followed by RIVIAN_ADVENTURE with 1 sites.
How much does it cost to install an EV charger in Durango?
Level 2 EV chargers in Durango typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Durango?
Most Durango projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Durango?
A typical commercial Level 2 installation in Durango energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Durango take to become profitable?
Payback in Durango depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage