Install EV Chargers in Crested Butte, Colorado

Install EV chargers or analyze a site in Crested Butte, Colorado. 11 existing public charging locations (1 DC fast, 10 Level 2). Free 0–100 profitability score on any Crested Butte address from EV Data Map by Charge Rigs.

Crested Butte, Colorado is served by 11 public electric vehicle charging locations operating 34 individual chargers — an average of 3.1 chargers per site. Of those locations, 1 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Crested Butte is ChargePoint Network with 8 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 63 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Crested Butte and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Crested Butte

Crested Butte, Colorado, presents a unique charging landscape characterized by a strong reliance on ChargePoint Network, which operates 70% of the city's 10 public charging locations. With only one DC fast charger averaging 63 kW and no sites exceeding this power level, there exists a significant opportunity for new entrants offering higher-capacity chargers. The current mix of charging options, with just 10% fast charging and a predominance of longer-dwell Level 2 stations, creates a specific demand profile that site developers must consider. This scenario suggests that innovative operators can address unmet needs in both power and convenience, thereby capitalizing on the deficiencies of the existing network while aligning with regional commuter patterns.

Crested Butte charging by the numbers

Locations
11
Chargers
34
DC Fast locations
1
Level 2 locations
10

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 3.1. Average DC fast power: 63 kW.

Crested Butte charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 3 networks.
Average DC fast power
63 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 11 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Crested Butte

The following operators run public charging in Crested Butte, ranked by number of locations.

Featured charging locations in Crested Butte

A selection of higher-power public charging locations across Crested Butte, sorted by power level.

  1. GCEA EV STATION DCFC CB FIRE — Crested Butte, CO, 81224 (ChargePoint Network · DC Fast · 62.5 kW)
  2. Town of Mt Crested Butte, TC-1 Lot — Crested Butte, CO, 81225 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  3. CLARK'S CB STATION 1 — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 9.6 kW)
  4. CLARK'S CB STATION 2 — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 9.6 kW)
  5. The Lodge at Mountaineer Square - Tesla Destination — Crested Butte, CO, 81225 (Tesla Destination · Level 2 · 7.2 kW)
  6. The Grand Lodge Crested Butte - Tesla Destination — Crested Butte, CO, 81225 (Tesla Destination · Level 2 · 7.2 kW)
  7. GCEA EV STATION CB 6TH & ELK — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 6.5 kW)
  8. GCEA EV STATION CB SOUTH — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TOWN OF CB TOWN HALL 1 — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 6.5 kW)
  10. GCEA EV STATION CB EV STATION — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CB FIRE HQ CB FIRE HQ — Crested Butte, CO, 81224 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Crested Butte specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Crested Butte, Colorado?
There are 11 public electric vehicle charging locations in Crested Butte, Colorado, with a combined 34 individual chargers. 1 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Crested Butte?
ChargePoint Network operates the most public charging locations in Crested Butte with 8 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Crested Butte?
Level 2 EV chargers in Crested Butte typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Crested Butte?
Most Crested Butte projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Crested Butte?
A typical commercial Level 2 installation in Crested Butte energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Crested Butte take to become profitable?
Payback in Crested Butte depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.