Install EV Chargers in Montrose, Colorado

Install EV chargers or analyze a site in Montrose, Colorado. 11 existing public charging locations (7 DC fast, 4 Level 2). Free 0–100 profitability score on any Montrose address from EV Data Map by Charge Rigs.

Montrose, Colorado is served by 11 public electric vehicle charging locations operating 37 individual chargers — an average of 3.4 chargers per site. Of those locations, 7 (64%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (36%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Montrose is Non-Networked with 2 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Montrose and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Montrose

Montrose distinguishes itself in the EV charging landscape with a diverse mix of 11 public locations, featuring 9 distinct charging operators, which fosters competitive pricing and maximizes uptime. The city boasts a compelling ultra-fast charging infrastructure, with 64% of its public sites classified as DC fast and an impressive average power output of 250 kW—topped by a 400 kW stall for rapid energy replenishment. Furthermore, with 86% of DC fast locations at 150 kW or above, drivers are empowered to make informed choices based on power availability and amenities, rather than resorting to a single brand. This strategic combination positions Montrose as a key player in the region, making it an attractive hub for EV drivers and operators alike.

Montrose charging by the numbers

Locations
11
Chargers
37
DC Fast locations
7
Level 2 locations
4

DC fast share: 64% of locations. Level 2 share: 36%. Average chargers per site: 3.4. Average DC fast power: 250 kW.

Montrose charging — local snapshot

Top operator share
Non-Networked runs 18% of public locations across 9 networks.
Average DC fast power
250 kW (fastest stall: 400 kW)
High-power share
86% of DC fast sites are 150 kW-class or higher
Mix
64% DC fast / 36% Level 2 across 11 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Montrose

The following operators run public charging in Montrose, ranked by number of locations.

Featured charging locations in Montrose

A selection of higher-power public charging locations across Montrose, sorted by power level.

  1. SureStay Plus - Montrose — Montrose, CO, 81401 (FCN · DC Fast · 400 kW)
  2. Kroger City Market 440 (Montrose, CO) — Montrose, CO, 81401 (Electrify America · DC Fast · 350 kW)
  3. Montrose, CO — Montrose, CO, 81401 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  4. Montrose, CO - Tesla Supercharger — Montrose, CO, 81401 (Tesla · DC Fast · 250 kW)
  5. MONTROSE EV 1 MONTROSE PL1 — Montrose, CO, 81401 (ChargePoint Network · DC Fast · 200 kW)
  6. MONTROSE EV 1 MONTROSE PL2 — Montrose, CO, 81401 (ChargePoint Network · DC Fast · 200 kW)
  7. Turner Automotive — MONTROSE, CO, 81401 (EV Connect · DC Fast · 50 kW)
  8. Montrose, CO - River Landing Shopping Center — Montrose, CO, 81401 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  9. Montrose Memorial Hospital — Montrose, CO, 81401 (Non-Networked · Level 2 · 7.2 kW)
  10. City of Montrose - Centennial Plaza — Montrose, CO, 81401 (Non-Networked · Level 2 · 7.2 kW)
  11. Montrose Community Rec. Center — Montrose, CO, 81401 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Montrose specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 4 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Montrose, Colorado?
There are 11 public electric vehicle charging locations in Montrose, Colorado, with a combined 37 individual chargers. 7 locations offer DC fast charging and 4 provide Level 2 charging.
What is the largest EV charging network in Montrose?
Non-Networked operates the most public charging locations in Montrose with 2 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Montrose?
Level 2 EV chargers in Montrose typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Montrose?
Most Montrose projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Montrose?
A typical commercial Level 2 installation in Montrose energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Montrose take to become profitable?
Payback in Montrose depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage