Install EV Chargers in Bristol, Connecticut

Install EV chargers or analyze a site in Bristol, Connecticut. 59 existing public charging locations (14 DC fast, 45 Level 2). Free 0–100 profitability score on any Bristol address from EV Data Map by Charge Rigs.

Bristol, Connecticut is served by 59 public electric vehicle charging locations operating 152 individual chargers — an average of 2.6 chargers per site. Of those locations, 14 (24%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 45 (76%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bristol is ChargePoint Network with 38 locations, followed by Non-Networked with 12. Average DC fast power across the city is approximately 69 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bristol and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bristol

Bristol, Connecticut presents a unique landscape for EV charging, with ChargePoint Network dominating 64% of the city's 59 public charging locations, making network reliability and consistency a key consideration for developers. With 14 DC fast charging sites averaging 69 kW, the fastest charging stall reaching 161 kW, Bristol's existing infrastructure leans towards older technology, as only 7% of these fast sites meet the 150 kW-class or higher standard. This creates an opportunity for new operators to introduce higher-capacity chargers, especially in an environment where 24% of public locations are dedicated to DC fast charging. As developers explore potential sites, the city’s distinct mix of charging options and the rising demand for robust fast charging solutions could guide strategic installations.

Bristol charging by the numbers

Locations
59
Chargers
152
DC Fast locations
14
Level 2 locations
45

DC fast share: 24% of locations. Level 2 share: 76%. Average chargers per site: 2.6. Average DC fast power: 69 kW.

Bristol charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 8 networks.
Average DC fast power
69 kW (fastest stall: 161 kW)
High-power share
7% of DC fast sites are 150 kW-class or higher
Mix
24% DC fast / 76% Level 2 across 59 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Bristol

The following operators run public charging in Bristol, ranked by number of locations.

Featured charging locations in Bristol

A selection of higher-power public charging locations across Bristol, sorted by power level.

  1. Terryville Avenue Valero — Bristol, CT, 06010 (RED_E · DC Fast · 161 kW)
  2. STEPHEN CAD SVC PDI2 62.5KW — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  3. CROWLEY NISSAN NISSAN L3-B — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  4. CROWLEY KIA KIA LEVEL 3-B — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  5. CHRYSLER 1461 CJDR L3-A — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  6. CROWLEY NISSAN NISSAN L3-A — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  7. CHRYSLER 238 23B LEVEL 3 - B — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  8. CHRYSLER 238 238 LEVEL 3 - A — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  9. STEPHEN CAD SHOWROOM 62.5KW — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  10. Crowley Nissan — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  11. CROWLEY KIA KIA LEVEL 3-D — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)
  12. CROWLEY KIA KIA LEVEL 3-C — Bristol, CT, 06010 (ChargePoint Network · DC Fast · 62.5 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bristol specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 45 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bristol, Connecticut?
There are 59 public electric vehicle charging locations in Bristol, Connecticut, with a combined 152 individual chargers. 14 locations offer DC fast charging and 45 provide Level 2 charging.
What is the largest EV charging network in Bristol?
ChargePoint Network operates the most public charging locations in Bristol with 38 sites, followed by Non-Networked with 12 sites.
How much does it cost to install an EV charger in Bristol?
Level 2 EV chargers in Bristol typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bristol?
Most Bristol projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bristol?
A typical commercial Level 2 installation in Bristol energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bristol take to become profitable?
Payback in Bristol depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage