Install EV Chargers in Waterbury, Connecticut

Install EV chargers or analyze a site in Waterbury, Connecticut. 39 existing public charging locations (4 DC fast, 35 Level 2). Free 0–100 profitability score on any Waterbury address from EV Data Map by Charge Rigs.

Waterbury, Connecticut is served by 39 public electric vehicle charging locations operating 136 individual chargers — an average of 3.5 chargers per site. Of those locations, 4 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 35 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Waterbury is Non-Networked with 21 locations, followed by ChargePoint Network with 10. Average DC fast power across the city is approximately 223 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Waterbury and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Waterbury

Waterbury's EV charging landscape showcases a competitive mix of 39 public charging locations, featuring 9 distinct operators that enhance price and uptime flexibility. Notably, 10% of these sites are equipped with DC fast chargers, which stand out with an impressive average power of 223 kW—positioning Waterbury as a destination for drivers seeking rapid charging options. With 75% of DC fast stations operating at 150 kW or higher, the city’s offerings are appealing for EV drivers prioritizing quick recharging. The presence of multiple networks, including a substantial proportion under the Non-Networked category, allows for tailored charging solutions, inviting users to choose based on power levels and local amenities rather than defaulting to one provider, further enriching the EV experience in the region.

Waterbury charging by the numbers

Locations
39
Chargers
136
DC Fast locations
4
Level 2 locations
35

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.5. Average DC fast power: 223 kW.

Waterbury charging — local snapshot

Top operator share
Non-Networked runs 54% of public locations across 9 networks.
Average DC fast power
223 kW (fastest stall: 320 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 39 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Waterbury

The following operators run public charging in Waterbury, ranked by number of locations.

Featured charging locations in Waterbury

A selection of higher-power public charging locations across Waterbury, sorted by power level.

  1. GPM INVESTMENTS 307 DC2 — Waterbury, CT, 06706 (ChargePoint Network · DC Fast · 320 kW)
  2. GPM INVESTMENTS 307 DC1 — Waterbury, CT, 06706 (ChargePoint Network · DC Fast · 320 kW)
  3. Dunkin' Donuts - Tesla Supercharger — Waterbury, CT, 06705 (Tesla · DC Fast · 150 kW)
  4. Waterbury Plaza — Waterbury, CT, 06704 (eVgo Network · DC Fast · 100 kW)
  5. Blasius Cadillac — Waterbury, CT, 06705 (EV Connect · Level 2 · 19.2 kW)
  6. Steelbrook Plaza Poweral — Waterbury, CT, 06708 (RED_E · Level 2 · 11.5 kW)
  7. 92 Brookside — Waterbury, CT, 06708 (Non-Networked · Level 2 · 11.5 kW)
  8. 10 Judith Lane — Waterbury, CT, 06704 (Non-Networked · Level 2 · 9.6 kW)
  9. 154 Jersey Street — Waterbury, CT, 06706 (Non-Networked · Level 2 · 9.6 kW)
  10. 170 Hillside Ave — Waterbury, CT, 06710 (Non-Networked · Level 2 · 9.6 kW)
  11. 117 Pine Street — Waterbury, CT, 06710 (Non-Networked · Level 2 · 9.6 kW)
  12. 92 Brookside Parking Lot Poweral — Waterbury, CT, 06708 (RED_E · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Waterbury specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 35 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Waterbury, Connecticut?
There are 39 public electric vehicle charging locations in Waterbury, Connecticut, with a combined 136 individual chargers. 4 locations offer DC fast charging and 35 provide Level 2 charging.
What is the largest EV charging network in Waterbury?
Non-Networked operates the most public charging locations in Waterbury with 21 sites, followed by ChargePoint Network with 10 sites.
How much does it cost to install an EV charger in Waterbury?
Level 2 EV chargers in Waterbury typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Waterbury?
Most Waterbury projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Waterbury?
A typical commercial Level 2 installation in Waterbury energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Waterbury take to become profitable?
Payback in Waterbury depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage