Install EV Chargers in New Britain, Connecticut

Install EV chargers or analyze a site in New Britain, Connecticut. 40 existing public charging locations (1 DC fast, 38 Level 2). Free 0–100 profitability score on any New Britain address from EV Data Map by Charge Rigs.

New Britain, Connecticut is served by 40 public electric vehicle charging locations operating 138 individual chargers — an average of 3.5 chargers per site. Of those locations, 1 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 38 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in New Britain is Non-Networked with 26 locations, followed by AMPUP with 6. Average DC fast power across the city is approximately 75 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in New Britain and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in New Britain

New Britain, Connecticut, features a public charging infrastructure predominantly operated by Non-Networked systems, which account for 65% of the city's 40 charging locations. This reliance on a single operator can significantly affect uptime and pricing stability, essential considerations for any new charging site. While the city offers only one DC fast charger at 75 kW, the outdated power profile places it below emerging standards, as newer stations often range from 150 to 350 kW. With only 3% of charging sites classified as DC fast, the majority cater to longer-dwelling vehicles with Level 2 stations. This combination of operator reliance and power limitation highlights strategic opportunities for developers looking to establish competitive and modern charging options in the local market.

New Britain charging by the numbers

Locations
40
Chargers
138
DC Fast locations
1
Level 2 locations
38

DC fast share: 3% of locations. Level 2 share: 95%. Average chargers per site: 3.5. Average DC fast power: 75 kW.

New Britain charging — local snapshot

Top operator share
Non-Networked runs 65% of public locations across 5 networks.
Average DC fast power
75 kW (fastest stall: 75 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 40 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in New Britain

The following operators run public charging in New Britain, ranked by number of locations.

Featured charging locations in New Britain

A selection of higher-power public charging locations across New Britain, sorted by power level.

  1. 10 Chestnut Street — New Britain, CT, 06051 (LOOP · DC Fast · 75 kW)
  2. 41 Grand St Parking Lot Poweral — New Britain, CT, 06052 (RED_E · Level 2 · 11.5 kW)
  3. Grandview Rehabilitation and Healthcare Center Parking Lot Poweral — New Britain, CT, 06052 (RED_E · Level 2 · 11.5 kW)
  4. Poweral EV Charging Station - Farmington Plaza — New Britain, CT, 06053 (Non-Networked · Level 2 · 11.5 kW)
  5. Farmington Plaza Site Poweral — New Britain, CT, 06053 (RED_E · Level 2 · 11.5 kW)
  6. 48 Grand St Parking Lot Poweral — New Britain, CT, 06052 (RED_E · Level 2 · 11.5 kW)
  7. 48 Grand St Parking Lot — New Britain, CT, 06052 (Non-Networked · Level 2 · 11.5 kW)
  8. 41 Grand St Parking Lot — New Britain, CT, 06052 (Non-Networked · Level 2 · 11.5 kW)
  9. 152 Tremont Street — New Britain, CT, 06051 (Non-Networked · Level 2 · 9.6 kW)
  10. 1390 East Street — New Britain, CT, 06053 (Non-Networked · unknown · 9.6 kW)
  11. 400 Brittany Farms - Autumn Lakes — New Britain, CT, 06053 (Non-Networked · Level 2 · 9.6 kW)
  12. 1380 East Street — New Britain, CT, 06053 (Non-Networked · Level 2 · 9.6 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For New Britain specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 38 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in New Britain, Connecticut?
There are 40 public electric vehicle charging locations in New Britain, Connecticut, with a combined 138 individual chargers. 1 locations offer DC fast charging and 38 provide Level 2 charging.
What is the largest EV charging network in New Britain?
Non-Networked operates the most public charging locations in New Britain with 26 sites, followed by AMPUP with 6 sites.
How much does it cost to install an EV charger in New Britain?
Level 2 EV chargers in New Britain typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in New Britain?
Most New Britain projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in New Britain?
A typical commercial Level 2 installation in New Britain energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in New Britain take to become profitable?
Payback in New Britain depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage