Install EV Chargers in Plainville, Connecticut

Install EV chargers or analyze a site in Plainville, Connecticut. 14 existing public charging locations (1 DC fast, 13 Level 2). Free 0–100 profitability score on any Plainville address from EV Data Map by Charge Rigs.

Plainville, Connecticut is served by 14 public electric vehicle charging locations operating 29 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Plainville is ChargePoint Network with 10 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Plainville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Plainville

Plainville, Connecticut's public EV charging landscape is notably characterized by its reliance on the ChargePoint Network, which accounts for 71% of the 14 total charging locations. This concentration can impact uptime and pricing, making it crucial for potential site developers to consider the competition with a major player like ChargePoint. While the city offers a mix of charging solutions, the sole DC fast charger operates at an average of 120 kW, positioning it in the mid-power range that may not meet the growing demands of EV drivers seeking faster charging options. With only 7% of charging sites designated as DC fast and the rest primarily composed of Level 2 chargers, opportunities exist for operators to introduce higher power options to enhance driver attraction and overall usage within Plainville.

Plainville charging by the numbers

Locations
14
Chargers
29
DC Fast locations
1
Level 2 locations
13

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 2.1. Average DC fast power: 120 kW.

Plainville charging — local snapshot

Top operator share
ChargePoint Network runs 71% of public locations across 3 networks.
Average DC fast power
120 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 14 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Plainville

The following operators run public charging in Plainville, ranked by number of locations.

Featured charging locations in Plainville

A selection of higher-power public charging locations across Plainville, sorted by power level.

  1. Gengras Ford — Plainville, CT, 06062 (FORD_CHARGE · DC Fast · 120 kW)
  2. CREW VOLKSWAGEN EV UNIT #2 — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 12 kW)
  3. CREW VOLKSWAGEN EV UNIT #3 — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 12 kW)
  4. 371 Woodford Ave, Plainville, CT. — Plainville, CT, 06062 (Non-Networked · Level 2 · 7.2 kW)
  5. 369 Woodford Ave, Plainville, CT. — Plainville, CT, 06062 (Non-Networked · Level 2 · 7.2 kW)
  6. 77 E Main St, Plainville, CT. — Plainville, CT, 06062 (Non-Networked · Level 2 · 7.2 kW)
  7. PLAINVILLE CT MUNICIPAL CNTR — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)
  8. PLAINVILLE CT REC CENTER — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)
  9. PLAINVILLE CT LIBRARY — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)
  10. PLAINVILLE CT PADEREWSKI PARK — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CREW VOLKSWAGEN EV UNIT #1 — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MANAFORT MB-2 — Plainville, CT, 06062 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Plainville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Plainville, Connecticut?
There are 14 public electric vehicle charging locations in Plainville, Connecticut, with a combined 29 individual chargers. 1 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Plainville?
ChargePoint Network operates the most public charging locations in Plainville with 10 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Plainville?
Level 2 EV chargers in Plainville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Plainville?
Most Plainville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Plainville?
A typical commercial Level 2 installation in Plainville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Plainville take to become profitable?
Payback in Plainville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.