Install EV Chargers in New Haven, Connecticut

Install EV chargers or analyze a site in New Haven, Connecticut. 154 existing public charging locations (6 DC fast, 148 Level 2). Free 0–100 profitability score on any New Haven address from EV Data Map by Charge Rigs.

New Haven, Connecticut is served by 154 public electric vehicle charging locations operating 484 individual chargers — an average of 3.1 chargers per site. Of those locations, 6 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 148 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in New Haven is ChargePoint Network with 68 locations, followed by LOOP with 52. Average DC fast power across the city is approximately 133 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in New Haven and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in New Haven

New Haven's EV charging landscape stands out with a robust mix of 154 public locations operated by 13 distinct networks, fostering competitive pricing and availability. ChargePoint Network leads with 44% of the sites, ensuring drivers have diverse options for their charging needs. The six DC fast chargers, averaging 133 kW, cater to those seeking quicker top-ups, with a notable 33% of these sites rated at 150 kW or higher. This mid-power fleet positions New Haven favorably for drivers using navigation apps, as newer charging solutions offering 150-350 kW power would enhance the local infrastructure. While most locations focus on longer-dwell Level 2 charging, the presence of fast chargers demonstrates a commitment to accommodating varied EV user demands in the city.

New Haven charging by the numbers

Locations
154
Chargers
484
DC Fast locations
6
Level 2 locations
148

DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 3.1. Average DC fast power: 133 kW.

New Haven charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 13 networks.
Average DC fast power
133 kW (fastest stall: 250 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
4% DC fast / 96% Level 2 across 154 locations
Estimated DC ports
29 fast-charging ports city-wide

Charging networks in New Haven

The following operators run public charging in New Haven, ranked by number of locations.

Featured charging locations in New Haven

A selection of higher-power public charging locations across New Haven, sorted by power level.

  1. Hotel Marcel - Tesla Supercharger — New Haven, CT, 06511 (Tesla · DC Fast · 250 kW)
  2. Whalley Commons - Tesla Supercharger — New Haven, CT, 06515 (Tesla · DC Fast · 250 kW)
  3. Cody's Diner — New Haven, CT, 06511 (VIALYNK · DC Fast · 120 kW)
  4. BRANDFON HYUN STATION 2 — New Haven, CT, 06512 (ChargePoint Network · DC Fast · 62.5 kW)
  5. BRANDFON HYUN STATION 1 — New Haven, CT, 06512 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Dunkin' Donuts — New Haven, CT, 06512 (eVgo Network · DC Fast · 50 kW)
  7. UNIVERSITY PROP 56 BROADWAY LOT — New Haven, CT, 06510 (ChargePoint Network · Level 2 · 19.2 kW)
  8. UNIVERSITY PROP 40 DIXWELL LOT — New Haven, CT, 06511 (ChargePoint Network · Level 2 · 19.2 kW)
  9. UNIVERSITY PROP AUDUBON GAR. 1A — New Haven, CT, 06510 (ChargePoint Network · Level 2 · 19.2 kW)
  10. UNIVERSITY PROP 255 CROWN LOT — New Haven, CT, 06511 (ChargePoint Network · Level 2 · 19.2 kW)
  11. UNIVERSITY PROP AUDUBON GAR. 1B — New Haven, CT, 06510 (ChargePoint Network · Level 2 · 19.2 kW)
  12. New Haven AFRC — New Haven, CT, 06512 (FLO · Level 2 · 13.3 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For New Haven specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 148 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in New Haven, Connecticut?
There are 154 public electric vehicle charging locations in New Haven, Connecticut, with a combined 484 individual chargers. 6 locations offer DC fast charging and 148 provide Level 2 charging.
What is the largest EV charging network in New Haven?
ChargePoint Network operates the most public charging locations in New Haven with 68 sites, followed by LOOP with 52 sites.
How much does it cost to install an EV charger in New Haven?
Level 2 EV chargers in New Haven typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in New Haven?
Most New Haven projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in New Haven?
A typical commercial Level 2 installation in New Haven energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in New Haven take to become profitable?
Payback in New Haven depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage