Install EV Chargers in Branford, Connecticut

Install EV chargers or analyze a site in Branford, Connecticut. 27 existing public charging locations (6 DC fast, 21 Level 2). Free 0–100 profitability score on any Branford address from EV Data Map by Charge Rigs.

Branford, Connecticut is served by 27 public electric vehicle charging locations operating 51 individual chargers — an average of 1.9 chargers per site. Of those locations, 6 (22%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (78%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Branford is ChargePoint Network with 8 locations, followed by FLO with 6. Average DC fast power across the city is approximately 133 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Branford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Branford

Branford stands out with a robust public EV charging infrastructure comprising 27 locations from seven distinct operators, fostering a competitive landscape that ensures varied pricing and uptime for drivers. ChargePoint Network leads with 30% of the sites, contributing to a nuanced selection process where users can prioritize power levels and amenities. With 22% of the charging stations offering DC fast options and an average power output of 133 kW, Branford provides ample opportunities for quick top-ups. Notably, one-third of the DC fast chargers support 150 kW or higher, positioning them favorably for drivers using navigation apps that favor high-power options. This intelligently mixed offering makes Branford an attractive charging destination amid its neighboring cities.

Branford charging by the numbers

Locations
27
Chargers
51
DC Fast locations
6
Level 2 locations
21

DC fast share: 22% of locations. Level 2 share: 78%. Average chargers per site: 1.9. Average DC fast power: 133 kW.

Branford charging — local snapshot

Top operator share
ChargePoint Network runs 30% of public locations across 7 networks.
Average DC fast power
133 kW (fastest stall: 150 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
22% DC fast / 78% Level 2 across 27 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Branford

The following operators run public charging in Branford, ranked by number of locations.

Featured charging locations in Branford

A selection of higher-power public charging locations across Branford, sorted by power level.

  1. I-95 Branford NB Service Plaza — Branford, CT, 06405 (APPLEGREEN · DC Fast · 150 kW)
  2. I-95 Branford SB Service Plaza — Branford, CT, 06405 (APPLEGREEN · DC Fast · 150 kW)
  3. BRANDFON CHARGE BHONDA 1 — Branford, CT, 06405 (ChargePoint Network · DC Fast · 125 kW)
  4. 365 E MAIN ST CPE250 1 — Branford, CT, 06405 (ChargePoint Network · DC Fast · 125 kW)
  5. BRANDFON CHARGE BHONDA 2 — Branford, CT, 06405 (ChargePoint Network · DC Fast · 125 kW)
  6. 365 E MAIN ST CPE250 2 — Branford, CT, 06405 (ChargePoint Network · DC Fast · 125 kW)
  7. PREMIER AUTO PREMSUBARU — Branford, CT, 06405 (ChargePoint Network · Level 2 · 15.4 kW)
  8. PREMIER AUTO PREMIER KIA — Branford, CT, 06405 (ChargePoint Network · Level 2 · 12 kW)
  9. Premier VinFast — Branford, CT, 06405 (Non-Networked · Level 2 · 9.5 kW)
  10. 10 Pine Orchard — Branford, CT, 06405 (LOOP · Level 2 · 7.7 kW)
  11. PREMIER AUTO PREMIER SUB1 — Branford, CT, 06405 (ChargePoint Network · Level 2 · 7.7 kW)
  12. Branford YMCA — Branford, CT, 06405 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Branford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Branford, Connecticut?
There are 27 public electric vehicle charging locations in Branford, Connecticut, with a combined 51 individual chargers. 6 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Branford?
ChargePoint Network operates the most public charging locations in Branford with 8 sites, followed by FLO with 6 sites.
How much does it cost to install an EV charger in Branford?
Level 2 EV chargers in Branford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Branford?
Most Branford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Branford?
A typical commercial Level 2 installation in Branford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Branford take to become profitable?
Payback in Branford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage