Install EV Chargers in Torrington, Connecticut

Install EV chargers or analyze a site in Torrington, Connecticut. 10 existing public charging locations (4 DC fast, 6 Level 2). Free 0–100 profitability score on any Torrington address from EV Data Map by Charge Rigs.

Torrington, Connecticut is served by 10 public electric vehicle charging locations operating 21 individual chargers — an average of 2.1 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Torrington is ChargePoint Network with 5 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 123 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Torrington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Torrington

Torrington boasts a competitive public charging landscape, exemplified by its 10 locations split across five distinct operators, with ChargePoint Network dominating at 50% of the sites. The presence of both DC fast and Level 2 charging options allows drivers to tailor their charging experience based on specific needs, with 40% of locations providing fast charging that averages a robust 123 kW. Notably, a quarter of these fast stations feature power outputs of 150 kW or higher, making them appealing choices for those seeking efficiency on the go. As the market evolves, new charging infrastructure entrants with 150–350 kW hardware will further enhance selection, positioning Torrington as a strategic charging hub for both local and corridor traffic.

Torrington charging by the numbers

Locations
10
Chargers
21
DC Fast locations
4
Level 2 locations
6

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 2.1. Average DC fast power: 123 kW.

Torrington charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 5 networks.
Average DC fast power
123 kW (fastest stall: 180 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Torrington

The following operators run public charging in Torrington, ranked by number of locations.

Featured charging locations in Torrington

A selection of higher-power public charging locations across Torrington, sorted by power level.

  1. Northwest Hills Cadillac — Torrington, CT, 06790 (EV Connect · DC Fast · 180 kW)
  2. NUMBER2OUTSIDE DC ISLAND 1 — Torrington, CT, 06790 (ChargePoint Network · DC Fast · 125 kW)
  3. NUMBER2OUTSIDE DC ISLAND 2 — Torrington, CT, 06790 (ChargePoint Network · DC Fast · 125 kW)
  4. SUBARU CUSTOMER CUSTOMEREXPRESS — Torrington, CT, 06790 (ChargePoint Network · DC Fast · 62.5 kW)
  5. 49 Hayden Hill Rd — Torrington, CT, 06790 (LOOP · Level 2 · 7.7 kW)
  6. Torrington Town Hall — Torrington, CT, 06790 (Non-Networked · Level 2 · 7.2 kW)
  7. 128 Church Street — Torrington, CT, 06790 (Non-Networked · Level 2 · 7.2 kW)
  8. ENG-000098 — Torrington, CT, 06790 (WEVO · Level 2 · 7.2 kW)
  9. WESTLODGE LAKERIDGE ST2 — Torrington, CT, 06790 (ChargePoint Network · Level 2 · 6.5 kW)
  10. WESTLODGE LAKERIDGE ST1 — Torrington, CT, 06790 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Connecticut we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Torrington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Torrington, Connecticut?
There are 10 public electric vehicle charging locations in Torrington, Connecticut, with a combined 21 individual chargers. 4 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Torrington?
ChargePoint Network operates the most public charging locations in Torrington with 5 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Torrington?
Level 2 EV chargers in Torrington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Torrington?
Most Torrington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Connecticut state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Torrington?
A typical commercial Level 2 installation in Torrington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Torrington take to become profitable?
Payback in Torrington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.