Install EV chargers or analyze a site in Dover, Delaware. 20 existing public charging locations (7 DC fast, 13 Level 2). Free 0–100 profitability score on any Dover address from EV Data Map by Charge Rigs.

Dover, Delaware is served by 20 public electric vehicle charging locations operating 65 individual chargers — an average of 3.3 chargers per site. Of those locations, 7 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Dover is ChargePoint Network with 8 locations, followed by Blink Network with 7. Average DC fast power across the city is approximately 141 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dover and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Dover

Dover's public EV charging landscape is characterized by a healthy mix of 20 locations shared among six distinct operators, ensuring competitive pricing and uptime for drivers. With ChargePoint Network leading at 40% of the sites, the city's infrastructure allows for nuanced selection based on power and amenities rather than brand loyalty. The seven DC fast charging locations provide an average power of 141 kW, boasting a peak stall at 350 kW, making them appealing for drivers seeking quicker top-ups. Notably, 43% of these fast sites deliver 150 kW or higher, accommodating a range of charging needs. This combination of diversity and power options positions Dover as a strategically significant hub, catering to both quick charging and longer dwell-time requirements.

Dover charging by the numbers

Locations
20
Chargers
65
DC Fast locations
7
Level 2 locations
13

DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 3.3. Average DC fast power: 141 kW.

Dover charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 6 networks.
Average DC fast power
141 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 20 locations
Estimated DC ports
29 fast-charging ports city-wide

Charging networks in Dover

The following operators run public charging in Dover, ranked by number of locations.

Featured charging locations in Dover

A selection of higher-power public charging locations across Dover, sorted by power level.

  1. Milbrook Dover Downs (Dover, DE) — Dover, DE, 19901 (Electrify America · DC Fast · 350 kW)
  2. Wawa - Tesla Supercharger — Dover, DE, 19904 (Tesla · DC Fast · 250 kW)
  3. Wawa - Tesla Supercharger — Dover, DE, 19901 (Tesla · DC Fast · 150 kW)
  4. WINNER HYUNDAI CPE-250 (LEFT) — Dover, DE, 19901 (ChargePoint Network · DC Fast · 62.5 kW)
  5. WINNER HYUNDAI CPE-250 (RIGHT) — Dover, DE, 19901 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Royal Farms - Dover, DE - RFS 139 — Dover, DE, 19901 (Blink Network · DC Fast · 60 kW)
  7. Kent County Motor Sales Co — Dover, DE, 19901 (EV Connect · DC Fast · 50 kW)
  8. City of Dover - City Hall — Dover, DE, 19901 (Blink Network · Level 2 · 19.2 kW)
  9. WINNER SVW 1387 VOLKSWAGEN — Dover, DE, 19901 (ChargePoint Network · Level 2 · 15.4 kW)
  10. Delaware Technical Community College — Dover, DE, 19904 (Blink Network · Level 2 · 8.6 kW)
  11. Sunset Village Camden Apartments — Dover, DE, 19904 (Blink Network · Level 2 · 8.3 kW)
  12. Holiday Inn Express and Suites — Dover, DE, 19901 (Blink Network · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Delaware we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Dover specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Dover, Delaware?
There are 20 public electric vehicle charging locations in Dover, Delaware, with a combined 65 individual chargers. 7 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Dover?
ChargePoint Network operates the most public charging locations in Dover with 8 sites, followed by Blink Network with 7 sites.
How much does it cost to install an EV charger in Dover?
Level 2 EV chargers in Dover typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Dover?
Most Dover projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Delaware state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Dover?
A typical commercial Level 2 installation in Dover energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Dover take to become profitable?
Payback in Dover depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.