Install EV Chargers in Rehoboth Beach, Delaware

Install EV chargers or analyze a site in Rehoboth Beach, Delaware. 10 existing public charging locations (2 DC fast, 8 Level 2). Free 0–100 profitability score on any Rehoboth Beach address from EV Data Map by Charge Rigs.

Rehoboth Beach, Delaware is served by 10 public electric vehicle charging locations operating 37 individual chargers — an average of 3.7 chargers per site. Of those locations, 2 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Rehoboth Beach is Blink Network with 6 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 215 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Rehoboth Beach and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Rehoboth Beach

Rehoboth Beach, Delaware, offers a robust EV charging landscape heavily influenced by Blink Network, which operates 60% of the city’s 10 public charging stations. This concentration presents a critical factor for site developers, as uptime and pricing are closely tied to this single operator. With two DC fast charging stations that boast an impressive average power of 215 kW—and the fastest stall reaching 250 kW—there’s a premium opportunity for new entrants to provide higher-capacity options, especially since all existing DC fast sites exceed 150 kW. This strategic position creates a unique environment where competitors can attract EV drivers by meeting the demand for ultra-fast charging while complementing the city's offering of Level 2 stations.

Rehoboth Beach charging by the numbers

Locations
10
Chargers
37
DC Fast locations
2
Level 2 locations
8

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 3.7. Average DC fast power: 215 kW.

Rehoboth Beach charging — local snapshot

Top operator share
Blink Network runs 60% of public locations across 4 networks.
Average DC fast power
215 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 10 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Rehoboth Beach

The following operators run public charging in Rehoboth Beach, ranked by number of locations.

Featured charging locations in Rehoboth Beach

A selection of higher-power public charging locations across Rehoboth Beach, sorted by power level.

  1. Royal Farms - Tesla Supercharger — Rehoboth Beach, DE, 19971 (Tesla · DC Fast · 250 kW)
  2. Royal Farms - Rehoboth, DE Coastal Hwy - RFS 226 — Rehoboth Beach, DE, 19971 (Blink Network · DC Fast · 180 kW)
  3. Rehoboth Beach, DE — Rehoboth Beach, DE, 19971 (Blink Network · Level 2 · 12 kW)
  4. Holts Landing State Park — Rehoboth Beach, DE, 19971 (Blink Network · Level 2 · 11.5 kW)
  5. Seaglass — Rehoboth Beach, DE, 19971 (Blink Network · Level 2 · 10 kW)
  6. The Bellmoor Inn & Spa, a Select Registry Property - Tesla Destination — Rehoboth Beach, DE, 19971 (Tesla Destination · Level 2 · 7.2 kW)
  7. CONVENT CENTER CONVENTION #2 — Rehoboth Beach, DE, 19971 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CONVENT CENTER CONVENTION #1 — Rehoboth Beach, DE, 19971 (ChargePoint Network · Level 2 · 6.5 kW)
  9. Schell Brothers — Rehoboth Beach, DE, 19971 (Blink Network · Level 2 · 6.2 kW)
  10. Sandpiper Plaza — Rehoboth Beach, DE, 19971 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Delaware we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Rehoboth Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Rehoboth Beach, Delaware?
There are 10 public electric vehicle charging locations in Rehoboth Beach, Delaware, with a combined 37 individual chargers. 2 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Rehoboth Beach?
Blink Network operates the most public charging locations in Rehoboth Beach with 6 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Rehoboth Beach?
Level 2 EV chargers in Rehoboth Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Rehoboth Beach?
Most Rehoboth Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Delaware state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Rehoboth Beach?
A typical commercial Level 2 installation in Rehoboth Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Rehoboth Beach take to become profitable?
Payback in Rehoboth Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage