Install EV Chargers in New Castle, Delaware

Install EV chargers or analyze a site in New Castle, Delaware. 26 existing public charging locations (9 DC fast, 17 Level 2). Free 0–100 profitability score on any New Castle address from EV Data Map by Charge Rigs.

New Castle, Delaware is served by 26 public electric vehicle charging locations operating 107 individual chargers — an average of 4.1 chargers per site. Of those locations, 9 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in New Castle is Blink Network with 15 locations, followed by Tesla with 4. Average DC fast power across the city is approximately 197 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in New Castle and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in New Castle

New Castle's EV charging infrastructure is notably competitive, featuring a diverse mix of six distinct charging networks across 26 public locations, primarily dominated by Blink Network at 58%. The city stands out with 35% of its charging points offering DC fast charging, boasting an impressive average power output of 197 kW, with the fastest stall reaching up to 350 kW. This modern fleet caters to a variety of driver needs, as 56% of fast-charging locations are at least 150 kW-class, allowing for quicker energy replenishment. As such, the nuanced charging ecosystem enables drivers to prioritize power and amenities over brand loyalty, creating a dynamic environment for both existing and prospective site developers.

New Castle charging by the numbers

Locations
26
Chargers
107
DC Fast locations
9
Level 2 locations
17

DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 4.1. Average DC fast power: 197 kW.

New Castle charging — local snapshot

Top operator share
Blink Network runs 58% of public locations across 6 networks.
Average DC fast power
197 kW (fastest stall: 350 kW)
High-power share
56% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 26 locations
Estimated DC ports
63 fast-charging ports city-wide

Charging networks in New Castle

The following operators run public charging in New Castle, ranked by number of locations.

Featured charging locations in New Castle

A selection of higher-power public charging locations across New Castle, sorted by power level.

  1. Wawa Store 840 (New Castle, DE) — New Castle, DE, 19720 (Electrify America · DC Fast · 350 kW)
  2. Wawa - Tesla Supercharger — New Castle, DE, 19702 (Tesla · DC Fast · 250 kW)
  3. Wawa - Tesla Supercharger — New Castle, DE, 19720 (Tesla · DC Fast · 250 kW)
  4. Royal Farms - Tesla Supercharger — New Castle, DE, 19720 (Tesla · DC Fast · 250 kW)
  5. Wawa - Tesla Supercharger — New Castle, DE, 19720 (Tesla · DC Fast · 250 kW)
  6. GPM INVESTMENTS 287 DC2 — New Castle, DE, 19720 (ChargePoint Network · DC Fast · 125 kW)
  7. GPM INVESTMENTS 287 DC1 — New Castle, DE, 19720 (ChargePoint Network · DC Fast · 125 kW)
  8. Carman Ford Lincoln - DCFC — New Castle, DE, 19720 (Blink Network · DC Fast · 120 kW)
  9. Sheridan Nissan — New Castle, DE, 19720 (IN_CHARGE · DC Fast · 50 kW)
  10. Carman Ford Lincoln - Series — New Castle, DE, 19720 (Blink Network · Level 2 · 15.4 kW)
  11. CONSTELLATION - DE HANGAR — New Castle, DE, 19720 (ChargePoint Network · Level 2 · 15.4 kW)
  12. CSMS River Road Training Site — New Castle, DE, 19720 (Blink Network · Level 2 · 11.5 kW)

Nearby cities with EV charging coverage

Other cities in Delaware we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For New Castle specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in New Castle, Delaware?
There are 26 public electric vehicle charging locations in New Castle, Delaware, with a combined 107 individual chargers. 9 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in New Castle?
Blink Network operates the most public charging locations in New Castle with 15 sites, followed by Tesla with 4 sites.
How much does it cost to install an EV charger in New Castle?
Level 2 EV chargers in New Castle typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in New Castle?
Most New Castle projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Delaware state, utility and NEVI-funded programs.
How long does it take to install an EV charger in New Castle?
A typical commercial Level 2 installation in New Castle energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in New Castle take to become profitable?
Payback in New Castle depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.