Install EV Chargers in Fort Pierce, Florida

Install EV chargers or analyze a site in Fort Pierce, Florida. 12 existing public charging locations (11 DC fast, 1 Level 2). Free 0–100 profitability score on any Fort Pierce address from EV Data Map by Charge Rigs.

Fort Pierce, Florida is served by 12 public electric vehicle charging locations operating 88 individual chargers — an average of 7.3 chargers per site. Of those locations, 11 (92%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 1 (8%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fort Pierce is ChargePoint Network with 5 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 177 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fort Pierce and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fort Pierce

Fort Pierce stands out with a robust and competitive EV charging landscape featuring 12 public stations, predominantly powered by DC fast chargers, which constitute 92% of the total. This modern infrastructure showcases an impressive average power output of 177 kW, with over half the charging sites offering 150 kW or higher, positioning Fort Pierce as an attractive option for drivers seeking rapid charging solutions. The presence of six distinct operators, with ChargePoint leading at 42% of the sites, enhances competitive pricing and ensures reliable uptime, allowing EV users to make informed choices based on power levels and available amenities. With a blend of high-power options and varied networks, Fort Pierce effectively meets the diverse needs of the growing EV community.

Fort Pierce charging by the numbers

Locations
12
Chargers
88
DC Fast locations
11
Level 2 locations
1

DC fast share: 92% of locations. Level 2 share: 8%. Average chargers per site: 7.3. Average DC fast power: 177 kW.

Fort Pierce charging — local snapshot

Top operator share
ChargePoint Network runs 42% of public locations across 6 networks.
Average DC fast power
177 kW (fastest stall: 400 kW)
High-power share
55% of DC fast sites are 150 kW-class or higher
Mix
92% DC fast / 8% Level 2 across 12 locations
Estimated DC ports
81 fast-charging ports city-wide

Charging networks in Fort Pierce

The following operators run public charging in Fort Pierce, ranked by number of locations.

Featured charging locations in Fort Pierce

A selection of higher-power public charging locations across Fort Pierce, sorted by power level.

  1. Fort Pierce, FL Rechargery @ Wawa - Selvitz Rd — Fort Pierce, FL, 34981 (IONNA · DC Fast · 400 kW)
  2. Flying J 622 — Fort Pierce, FL, 34945 (eVgo Network · DC Fast · 350 kW)
  3. Wawa - Tesla Supercharger — Fort Pierce, FL, 34945 (Tesla · DC Fast · 250 kW)
  4. Wawa - Tesla Supercharger — Fort Pierce, FL, 34947 (Tesla · DC Fast · 250 kW)
  5. Florida Nexxus Park- Tesla Supercharger — Fort Pierce, FL, 34945 (Tesla · DC Fast · 250 kW)
  6. Sunrise Ford — Fort Pierce, FL, 34982 (CHARGESMART_EV · DC Fast · 180 kW)
  7. CAMPINGWORLD FT. PIERCE DC1 — Fort Pierce, FL, 34947 (ChargePoint Network · DC Fast · 62.5 kW)
  8. SVWFP STATION 2 — Fort Pierce, FL, 34982 (ChargePoint Network · DC Fast · 62.5 kW)
  9. SVWFP STATION 3 — Fort Pierce, FL, 34982 (ChargePoint Network · DC Fast · 62.5 kW)
  10. Garber Buick GMC — Fort Pierce, FL, 34982 (EV Connect · DC Fast · 50 kW)
  11. SVWFP STATION 1 — Fort Pierce, FL, 34982 (ChargePoint Network · DC Fast · 31 kW)
  12. CAMPINGWORLD FT. PIERCE AC1 — Fort Pierce, FL, 34947 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fort Pierce specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 1 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fort Pierce, Florida?
There are 12 public electric vehicle charging locations in Fort Pierce, Florida, with a combined 88 individual chargers. 11 locations offer DC fast charging and 1 provide Level 2 charging.
What is the largest EV charging network in Fort Pierce?
ChargePoint Network operates the most public charging locations in Fort Pierce with 5 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in Fort Pierce?
Level 2 EV chargers in Fort Pierce typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fort Pierce?
Most Fort Pierce projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fort Pierce?
A typical commercial Level 2 installation in Fort Pierce energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fort Pierce take to become profitable?
Payback in Fort Pierce depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage