Install EV chargers or analyze a site in Port St. Lucie, Florida. 20 existing public charging locations (9 DC fast, 11 Level 2). Free 0–100 profitability score on any Port St. Lucie address from EV Data Map by Charge Rigs.
Port St. Lucie, Florida is served by 20 public electric vehicle charging locations operating 88 individual chargers — an average of 4.4 chargers per site. Of those locations, 9 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Port St. Lucie is ChargePoint Network with 9 locations, followed by FPLEV with 4. Average DC fast power across the city is approximately 271 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Port St. Lucie and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Port St. Lucie
Port St. Lucie boasts a robust public charging infrastructure, featuring 20 locations with a notable emphasis on rapid charging solutions. With 45% of these locations offering DC fast charging, drivers can access an average power of 271 kW, peaking at an impressive 400 kW. This concentration on high-capacity charging is complemented by the presence of six distinct operators, fostering a competitive environment that encourages diverse pricing and uptime options. ChargePoint Network dominates with 45% of the sites, yet the variety allows drivers to choose based on power and amenities. As a result, Port St. Lucie's infrastructure caters effectively to both quick top-offs and longer stays, making it a strategic hub in the region’s EV ecosystem.
Port St. Lucie charging by the numbers
Locations
20
Chargers
88
DC Fast locations
9
Level 2 locations
11
DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 4.4. Average DC fast power: 271 kW.
Port St. Lucie charging — local snapshot
Top operator share
ChargePoint Network runs 45% of public locations across 6 networks.
Average DC fast power
271 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 20 locations
Estimated DC ports
58 fast-charging ports city-wide
Charging networks in Port St. Lucie
The following operators run public charging in Port St. Lucie, ranked by number of locations.
ChargePoint Network — 9 locations
FPLEV — 4 locations
Tesla Destination — 2 locations
Tesla — 2 locations
Blink Network — 2 locations
Electrify America — 1 location
Featured charging locations in Port St. Lucie
A selection of higher-power public charging locations across Port St. Lucie, sorted by power level.
Dunkin' — Port St Lucie, FL, 34952 (FPLEV · DC Fast · 400 kW)
Florida Power & Light - EVolution - St. Lucie Job Express Terminal Park and Ride — Port St. Lucie, FL, 34953 (FPLEV · DC Fast · 350 kW)
Walmart 3527 (Port St Lucie, FL) — Port St Lucie, FL, 34986 (Electrify America · DC Fast · 350 kW)
Florida Power & Light - EVolution - Fort Pierce Turnpike Service Plaza — Port St. Lucie, FL, 34984 (FPLEV · DC Fast · 350 kW)
Port St. Lucie-Fort Pierce Service Plaza - Tesla Supercharger — Port St. Lucie, FL, 34984 (Tesla · DC Fast · 250 kW)
DC CORRIDOR PT ST LUCIE DC2 — Port St. Lucie, FL, 34987 (ChargePoint Network · DC Fast · 205 kW)
DC CORRIDOR PT ST LUCIE DC1 — Port St. Lucie, FL, 34987 (ChargePoint Network · DC Fast · 205 kW)
Veranda Falls — Port St Lucie, FL, 34984 (FPLEV · DC Fast · 180 kW)
Town Center at St. Lucie West - Tesla Supercharger — Port St. Lucie, FL, 34986 (Tesla · DC Fast · 150 kW)
Legend Point Investors — Port St. Lucie, FL, 34983 (Blink Network · Level 2 · 10.8 kW)
Alton Central Park Apartments — Port St. Lucie, FL, 34987 (Blink Network · Level 2 · 10.4 kW)
Residence Inn Port St. Lucie - Tesla Destination — Port St Lucie, FL, 34986 (Tesla Destination · Level 2 · 7.2 kW)
Nearby cities with EV charging coverage
Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Port St. Lucie specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Port St. Lucie, Florida?
There are 20 public electric vehicle charging locations in Port St. Lucie, Florida, with a combined 88 individual chargers. 9 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Port St. Lucie?
ChargePoint Network operates the most public charging locations in Port St. Lucie with 9 sites, followed by FPLEV with 4 sites.
How much does it cost to install an EV charger in Port St. Lucie?
Level 2 EV chargers in Port St. Lucie typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Port St. Lucie?
Most Port St. Lucie projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Port St. Lucie?
A typical commercial Level 2 installation in Port St. Lucie energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Port St. Lucie take to become profitable?
Payback in Port St. Lucie depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.