Install EV Chargers in Lutz, Florida

Install EV chargers or analyze a site in Lutz, Florida. 18 existing public charging locations (2 DC fast, 16 Level 2). Free 0–100 profitability score on any Lutz address from EV Data Map by Charge Rigs.

Lutz, Florida is served by 18 public electric vehicle charging locations operating 46 individual chargers — an average of 2.6 chargers per site. Of those locations, 2 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lutz is Blink Network with 7 locations, followed by ChargePoint Network with 6. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lutz and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lutz

Lutz, Florida features a competitive and diverse public EV charging landscape, hosting 18 locations managed by six distinct operators, with Blink Network leading at 39% of sites. The two DC fast charging stations, averaging 250 kW in power and boasting a maximum of 350 kW, set a high standard for fast charging efficiency, as all DC fast sites are rated at 150 kW-class or higher. This ultrafast capability attracts EV drivers looking for quick top-ups while navigating the area. Meanwhile, the remaining Level 2 chargers cater to longer-stay needs. With a unique mix of charging options and sustained competition, Lutz is poised as an attractive destination for both drivers and potential new charging network entrants.

Lutz charging by the numbers

Locations
18
Chargers
46
DC Fast locations
2
Level 2 locations
16

DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 2.6. Average DC fast power: 250 kW.

Lutz charging — local snapshot

Top operator share
Blink Network runs 39% of public locations across 6 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 18 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Lutz

The following operators run public charging in Lutz, ranked by number of locations.

Featured charging locations in Lutz

A selection of higher-power public charging locations across Lutz, sorted by power level.

  1. Simon Tampa Premium Outlets (Lutz, FL) — Lutz, FL, 33559 (Electrify America · DC Fast · 350 kW)
  2. Advent Health Pasco ER — Lutz, FL, 34638 (EV Connect · DC Fast · 150 kW)
  3. 2936 AutoNation USA Wesley Chapel — Lutz, FL, 33559 (Blink Network · Level 2 · 21.6 kW)
  4. Henley Residences — Lutz, FL, 33558 (Blink Network · Level 2 · 16.6 kW)
  5. The Cottages at Cypress Cay — Lutz, FL, 33559 (Blink Network · Level 2 · 12 kW)
  6. Hilton Garden Inn Tampa Suncoast Parkway - Tesla Destination — Lutz, FL, 33558 (Tesla Destination · Level 2 · 7.2 kW)
  7. First National Bank - Pasco — Lutz, FL, 33559 (Non-Networked · Level 2 · 7.2 kW)
  8. Hyatt Place Wesley Chapel - Tesla Destination — Lutz, FL, 33559 (Tesla Destination · Level 2 · 7.2 kW)
  9. Altis Grand Suncoast (Parking 2) — Lutz, FL, 33558 (Blink Network · Level 2 · 6.7 kW)
  10. Altis Grand Suncoast (Parking 3) — Lutz, FL, 33558 (Blink Network · Level 2 · 6.7 kW)
  11. Lake Carlton Arms — Lutz, FL, 33558 (Blink Network · Level 2 · 6.7 kW)
  12. Altis Grand Suncoast (Parking 1) — Lutz, FL, 33558 (Blink Network · Level 2 · 6.7 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lutz specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lutz, Florida?
There are 18 public electric vehicle charging locations in Lutz, Florida, with a combined 46 individual chargers. 2 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Lutz?
Blink Network operates the most public charging locations in Lutz with 7 sites, followed by ChargePoint Network with 6 sites.
How much does it cost to install an EV charger in Lutz?
Level 2 EV chargers in Lutz typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lutz?
Most Lutz projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lutz?
A typical commercial Level 2 installation in Lutz energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lutz take to become profitable?
Payback in Lutz depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage