Install EV Chargers in Plant City, Florida

Install EV chargers or analyze a site in Plant City, Florida. 16 existing public charging locations (3 DC fast, 13 Level 2). Free 0–100 profitability score on any Plant City address from EV Data Map by Charge Rigs.

Plant City, Florida is served by 16 public electric vehicle charging locations operating 42 individual chargers — an average of 2.6 chargers per site. Of those locations, 3 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Plant City is ChargePoint Network with 10 locations, followed by CHARGEUP with 1. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Plant City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Plant City

Plant City, Florida, features a well-structured EV charging network, with ChargePoint Network operating 63% of the 16 charging locations. This concentration offers potential site developers a clear understanding of the competitive landscape, especially given that 67% of the three DC fast charging stations exceed 150 kW. The presence of 12 accessible DC fast ports—averaging 180 kW and reaching up to 250 kW—positions the city as a competitive option for drivers seeking rapid charging solutions. Meanwhile, the remaining Level 2 chargers cater to longer-stay needs, ensuring a comprehensive service mix. Developers can leverage EV Data Map to identify unmet charging demands in a rapidly evolving local market, enhancing the strategic placement of new sites.

Plant City charging by the numbers

Locations
16
Chargers
42
DC Fast locations
3
Level 2 locations
13

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 2.6. Average DC fast power: 180 kW.

Plant City charging — local snapshot

Top operator share
ChargePoint Network runs 63% of public locations across 7 networks.
Average DC fast power
180 kW (fastest stall: 250 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 16 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Plant City

The following operators run public charging in Plant City, ranked by number of locations.

Featured charging locations in Plant City

A selection of higher-power public charging locations across Plant City, sorted by power level.

  1. Wawa - Tesla Supercharger — Plant City, FL, 33563 (Tesla · DC Fast · 250 kW)
  2. Jarrett Scott Ford — Plant City, FL, 33563 (FORD_CHARGE · DC Fast · 240 kW)
  3. Jarrett-Scott Ford — Plant City, FL, 33563 (Non-Networked · DC Fast · 50 kW)
  4. Century Lakehouse — Plant City, FL, 33566 (LOOP · Level 2 · 7.7 kW)
  5. Plant City Main Office — Plant City, FL, 33563 (CHARGEUP · Level 2 · 7.6 kW)
  6. Hampton Inn Plant City - Tesla Destination — Plant City, FL, 33563 (Tesla Destination · Level 2 · 7.2 kW)
  7. CITY FURNITURE PC OFFICES 4 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)
  8. CITY FURNITURE PC OFFICES 2 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITY FURNITURE PC OFFICES 1 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY FURNITURE PC OFFICES 3 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY FURNITURE PC OFFICES 5 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY FURNITURE PC SHOWROOM 2 — Plant City, FL, 33566 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Plant City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Plant City, Florida?
There are 16 public electric vehicle charging locations in Plant City, Florida, with a combined 42 individual chargers. 3 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Plant City?
ChargePoint Network operates the most public charging locations in Plant City with 10 sites, followed by CHARGEUP with 1 sites.
How much does it cost to install an EV charger in Plant City?
Level 2 EV chargers in Plant City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Plant City?
Most Plant City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Plant City?
A typical commercial Level 2 installation in Plant City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Plant City take to become profitable?
Payback in Plant City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage