Install EV Chargers in Riverview, Florida

Install EV chargers or analyze a site in Riverview, Florida. 15 existing public charging locations (6 DC fast, 9 Level 2). Free 0–100 profitability score on any Riverview address from EV Data Map by Charge Rigs.

Riverview, Florida is served by 15 public electric vehicle charging locations operating 71 individual chargers — an average of 4.7 chargers per site. Of those locations, 6 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Riverview is Blink Network with 4 locations, followed by ChargePoint Network with 3. Average DC fast power across the city is approximately 213 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Riverview and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Riverview

Riverview, Florida boasts a competitive EV charging landscape with 15 public locations serviced by eight distinct operators, enhancing choice for drivers. With 40% of these sites offering DC fast charging, users can access an impressive average power of 213 kW, alongside ultra-fast options reaching up to 400 kW. Every DC fast location is equipped with at least 150 kW equipment, ensuring efficient charging experiences. The presence of diverse operators, led by Blink Network, not only fosters competitive pricing but encourages informed choices among drivers who prioritize power and amenities over brand loyalty. This dynamic environment is reflected in Riverview's comprehensive EV landscape, appealing to both local residents and visitors navigating the surrounding cities.

Riverview charging by the numbers

Locations
15
Chargers
71
DC Fast locations
6
Level 2 locations
9

DC fast share: 40% of locations. Level 2 share: 60%. Average chargers per site: 4.7. Average DC fast power: 213 kW.

Riverview charging — local snapshot

Top operator share
Blink Network runs 27% of public locations across 8 networks.
Average DC fast power
213 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 15 locations
Estimated DC ports
44 fast-charging ports city-wide

Charging networks in Riverview

The following operators run public charging in Riverview, ranked by number of locations.

Featured charging locations in Riverview

A selection of higher-power public charging locations across Riverview, sorted by power level.

  1. Shoppes at Boyette MB.HPC — Riverview, FL, 33569 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. Wawa - Tesla Supercharger — Riverview, FL, 33578 (Tesla · DC Fast · 250 kW)
  3. 7Charge - Riverview 32984 — Riverview, FL, 33578 (7CHARGE · DC Fast · 180 kW)
  4. Thorntons, Progress Blvd, Riverview, FL — Riverview, FL, 33578 (BP_PULSE · DC Fast · 150 kW)
  5. Winn-Dixie - Tesla Supercharger — Riverview, FL, 33578 (Tesla · DC Fast · 150 kW)
  6. Thorntons, Big Bend Rd, Riverview, FL — Riverview, FL, 33578 (BP_PULSE · DC Fast · 150 kW)
  7. Summerall — Riverview, FL, 33578 (NOODOE · Level 2 · 19 kW)
  8. DD FL-Southcreek — Riverview, FL, 33578 (Blink Network · Level 2 · 13 kW)
  9. Walgreens #9475 — Riverview, FL, 33578 (Blink Network · Level 2 · 8.6 kW)
  10. Integra Palms — Riverview, FL, 33578 (Blink Network · Level 2 · 8.6 kW)
  11. Hilton Garden Inn Tampa/Riverview/Brandon - Tesla Destination — Riverview, FL, 33578 (Tesla Destination · Level 2 · 7.2 kW)
  12. The Oasis at 301 — Riverview, FL, 33578 (Blink Network · Level 2 · 6.7 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Riverview specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Riverview, Florida?
There are 15 public electric vehicle charging locations in Riverview, Florida, with a combined 71 individual chargers. 6 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Riverview?
Blink Network operates the most public charging locations in Riverview with 4 sites, followed by ChargePoint Network with 3 sites.
How much does it cost to install an EV charger in Riverview?
Level 2 EV chargers in Riverview typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Riverview?
Most Riverview projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Riverview?
A typical commercial Level 2 installation in Riverview energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Riverview take to become profitable?
Payback in Riverview depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage