Install EV Chargers in Tampa, Florida

Install EV chargers or analyze a site in Tampa, Florida. 233 existing public charging locations (28 DC fast, 204 Level 2). Free 0–100 profitability score on any Tampa address from EV Data Map by Charge Rigs.

Tampa, Florida is served by 233 public electric vehicle charging locations operating 883 individual chargers — an average of 3.8 chargers per site. Of those locations, 28 (12%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 204 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tampa is ChargePoint Network with 108 locations, followed by CHARGEUP with 35. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tampa and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tampa

Tampa's EV charging landscape is characterized by a robust diversity of 233 public charging locations, featuring 15 distinct operators. ChargePoint Network dominates the market with 46% of the sites, facilitating competitive pricing and reliability. Notably, 12% of these locations offer DC fast charging, averaging a substantial 180 kW, with a remarkable 68% of them classified as 150 kW or higher. This high-powered fleet enables drivers to choose chargers based on both performance and amenities rather than brand preference. With the fastest charging option reaching 350 kW, Tampa presents an attractive proposition for EV drivers seeking efficient charging solutions, ensuring that both urban and suburban charging needs are effectively addressed.

Tampa charging by the numbers

Locations
233
Chargers
883
DC Fast locations
28
Level 2 locations
204

DC fast share: 12% of locations. Level 2 share: 88%. Average chargers per site: 3.8. Average DC fast power: 180 kW.

Tampa charging — local snapshot

Top operator share
ChargePoint Network runs 46% of public locations across 15 networks.
Average DC fast power
180 kW (fastest stall: 350 kW)
High-power share
68% of DC fast sites are 150 kW-class or higher
Mix
12% DC fast / 88% Level 2 across 233 locations
Estimated DC ports
154 fast-charging ports city-wide

Charging networks in Tampa

The following operators run public charging in Tampa, ranked by number of locations.

Featured charging locations in Tampa

A selection of higher-power public charging locations across Tampa, sorted by power level.

  1. Walk at Highwoods Preserve (Tampa, FL) — Tampa, FL, 33647 (Electrify America · DC Fast · 350 kW)
  2. Milbrook Properties Point Plaza (Temple Terrace, FL) — Tampa, FL, 33637 (Electrify America · DC Fast · 350 kW)
  3. Taubman International Plaza (Tampa, FL) — Tampa, FL, 33607 (Electrify America · DC Fast · 350 kW)
  4. IKEA Store 042 (Tampa, FL) — Tampa, FL, 33605 (Electrify America · DC Fast · 350 kW)
  5. Tampa Bay Center - Tesla Supercharger — Tampa, FL, 33607 (Tesla · DC Fast · 325 kW)
  6. Wawa - Tesla Supercharger — Tampa, FL, 33603 (Tesla · DC Fast · 325 kW)
  7. Wawa - Tesla Supercharger — Tampa, FL, 33610 (Tesla · DC Fast · 250 kW)
  8. Wawa - Tesla Supercharger — Tampa, FL, 33613 (Tesla · DC Fast · 250 kW)
  9. Wawa - Tesla Supercharger — Tampa, FL, 33609 (Tesla · DC Fast · 250 kW)
  10. Bill Currie Ford - DCFC — Tampa, FL, 33614 (Blink Network · DC Fast · 180 kW)
  11. 7Charge - Tampa 33019 — Tampa, FL, 33647 (7CHARGE · DC Fast · 180 kW)
  12. Rivard Buick GMC — Tampa, FL, 33619 (EV Connect · DC Fast · 180 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tampa specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 28 DC fast and 204 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tampa, Florida?
There are 233 public electric vehicle charging locations in Tampa, Florida, with a combined 883 individual chargers. 28 locations offer DC fast charging and 204 provide Level 2 charging.
What is the largest EV charging network in Tampa?
ChargePoint Network operates the most public charging locations in Tampa with 108 sites, followed by CHARGEUP with 35 sites.
How much does it cost to install an EV charger in Tampa?
Level 2 EV chargers in Tampa typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tampa?
Most Tampa projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tampa?
A typical commercial Level 2 installation in Tampa energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tampa take to become profitable?
Payback in Tampa depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage