Install EV Chargers in Cartersville, Georgia

Install EV chargers or analyze a site in Cartersville, Georgia. 23 existing public charging locations (4 DC fast, 19 Level 2). Free 0–100 profitability score on any Cartersville address from EV Data Map by Charge Rigs.

Cartersville, Georgia is served by 23 public electric vehicle charging locations operating 38 individual chargers — an average of 1.7 chargers per site. Of those locations, 4 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cartersville is ChargePoint Network with 12 locations, followed by Blink Network with 6. Average DC fast power across the city is approximately 168 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cartersville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cartersville

Cartersville offers a dynamic public charging landscape featuring 23 locations shared among seven charging networks, ensuring competitive pricing and uptime. With ChargePoint Network dominating at over half of the sites, drivers have access to varied options that cater to both power and amenities. The city's four DC fast charging locations stand out with an average power output of 168 kW and the potential to reach 250 kW at the fastest stall, reflecting a robust high-power infrastructure. Notably, half of the DC fast chargers are classified at 150 kW or higher, positioning Cartersville as a key stop for EV drivers in their journeys, while Level 2 chargers cater to longer dwell times. This combination creates an appealing ecosystem for both EV users and potential site developers.

Cartersville charging by the numbers

Locations
23
Chargers
38
DC Fast locations
4
Level 2 locations
19

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 1.7. Average DC fast power: 168 kW.

Cartersville charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 7 networks.
Average DC fast power
168 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 23 locations
Estimated DC ports
7 fast-charging ports city-wide

Charging networks in Cartersville

The following operators run public charging in Cartersville, ranked by number of locations.

Featured charging locations in Cartersville

A selection of higher-power public charging locations across Cartersville, sorted by power level.

  1. GEORGIA POWER LAKEPOINT DC2 — Cartersville, GA, 30121 (ChargePoint Network · DC Fast · 250 kW)
  2. GEORGIA POWER LAKEPOINT DC1 — Cartersville, GA, 30121 (ChargePoint Network · DC Fast · 250 kW)
  3. Pugmire Ford of Cartersville — Cartersville, GA, 30120 (FORD_CHARGE · DC Fast · 120 kW)
  4. Riverside Buick GMC Cadillac of Cartersville — CARTERSVILLE, GA, 30120 (EV Connect · DC Fast · 50 kW)
  5. Stay-N-Charge EV Charging Station - Holiday Inn Express & Suites Cartersville — Cartersville, GA, 30121 (STAY_N_CHARGE · Level 2 · 11.5 kW)
  6. Arcadia Building 6 — Cartersville, GA, 30121 (AUTEL · Level 2 · 8 kW)
  7. ELEMENT CARTERS STATION 3 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)
  8. ELEMENT CARTERS STATION 4 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)
  9. ELEMENT CARTERS STATION 1 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)
  10. ELEMENT CARTERS STATION 2 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)
  11. ELEMENT CARTERS STATION 6 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)
  12. ELEMENT CARTERS STATION 5 — Cartersville, GA, 30121 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cartersville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cartersville, Georgia?
There are 23 public electric vehicle charging locations in Cartersville, Georgia, with a combined 38 individual chargers. 4 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Cartersville?
ChargePoint Network operates the most public charging locations in Cartersville with 12 sites, followed by Blink Network with 6 sites.
How much does it cost to install an EV charger in Cartersville?
Level 2 EV chargers in Cartersville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cartersville?
Most Cartersville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cartersville?
A typical commercial Level 2 installation in Cartersville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cartersville take to become profitable?
Payback in Cartersville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage