Install EV chargers or analyze a site in Woodstock, Georgia. 12 existing public charging locations (5 DC fast, 7 Level 2). Free 0–100 profitability score on any Woodstock address from EV Data Map by Charge Rigs.
Woodstock, Georgia is served by 12 public electric vehicle charging locations operating 35 individual chargers — an average of 2.9 chargers per site. Of those locations, 5 (42%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (58%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Woodstock is ChargePoint Network with 7 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 173 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Woodstock and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Woodstock
Woodstock, Georgia, boasts a competitive public charging landscape with 12 locations featuring a standout mix of 42% DC fast chargers, including those with impressive average power levels of 173 kW and a top tier stall reaching 350 kW. This high-quality infrastructure, with 40% of fast chargers at 150 kW or higher, enables swift charging for drivers, while the presence of five distinct networks, predominantly led by ChargePoint at 58%, enhances pricing and service options. Such diversity allows EV drivers to choose based on power and amenities rather than being limited to one provider. The combination of these factors positions Woodstock as an appealing destination for EV owners seeking robust and versatile charging solutions.
Woodstock charging by the numbers
Locations
12
Chargers
35
DC Fast locations
5
Level 2 locations
7
DC fast share: 42% of locations. Level 2 share: 58%. Average chargers per site: 2.9. Average DC fast power: 173 kW.
Woodstock charging — local snapshot
Top operator share
ChargePoint Network runs 58% of public locations across 5 networks.
Average DC fast power
173 kW (fastest stall: 350 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
42% DC fast / 58% Level 2 across 12 locations
Estimated DC ports
21 fast-charging ports city-wide
Charging networks in Woodstock
The following operators run public charging in Woodstock, ranked by number of locations.
ChargePoint Network — 7 locations
Blink Network — 2 locations
Tesla — 1 location
Electrify America — 1 location
STAY_N_CHARGE — 1 location
Featured charging locations in Woodstock
A selection of higher-power public charging locations across Woodstock, sorted by power level.
Bank of America GA7-634 (Woodstock, GA) — Woodstock, GA, 30188 (Electrify America · DC Fast · 350 kW)
The Outlet Shoppes at Atlanta - Tesla Supercharger — Woodstock, GA, 30188 (Tesla · DC Fast · 250 kW)
KRAUSE FORD PL 2 — Woodstock, GA, 30188 (ChargePoint Network · DC Fast · 120 kW)
KRAUSE FORD PL 1 — Woodstock, GA, 30188 (ChargePoint Network · DC Fast · 120 kW)
WOODSTOCK-KIA CKW1 — Woodstock, GA, 30188 (ChargePoint Network · DC Fast · 24 kW)
KRAUSE FORD CHARGER LEV 2 B — Woodstock, GA, 30188 (ChargePoint Network · Level 2 · 19.2 kW)
KRAUSE FORD CHARGER LEV 2 A — Woodstock, GA, 30188 (ChargePoint Network · Level 2 · 19.2 kW)
Stay-N-Charge EV Charging Station - Holiday Inn Express & Suites, Atlanta N - Woodstock — Woodstock, GA, 30188 (STAY_N_CHARGE · Level 2 · 11.5 kW)
DOWNTOWN MAPLE STREET — Woodstock, GA, 30188 (ChargePoint Network · Level 2 · 6.5 kW)
DOWNTOWN MILL ST LOT — Woodstock, GA, 30188 (ChargePoint Network · Level 2 · 6.5 kW)
Station 92 at Woodstock Apartment — Woodstock, GA, 30188 (Blink Network · Level 2 · 6.2 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Woodstock specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Woodstock, Georgia?
There are 12 public electric vehicle charging locations in Woodstock, Georgia, with a combined 35 individual chargers. 5 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Woodstock?
ChargePoint Network operates the most public charging locations in Woodstock with 7 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Woodstock?
Level 2 EV chargers in Woodstock typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Woodstock?
Most Woodstock projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Woodstock?
A typical commercial Level 2 installation in Woodstock energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Woodstock take to become profitable?
Payback in Woodstock depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.