Install EV Chargers in Canton, Georgia

Install EV chargers or analyze a site in Canton, Georgia. 24 existing public charging locations (2 DC fast, 22 Level 2). Free 0–100 profitability score on any Canton address from EV Data Map by Charge Rigs.

Canton, Georgia is served by 24 public electric vehicle charging locations operating 50 individual chargers — an average of 2.1 chargers per site. Of those locations, 2 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 22 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Canton is ChargePoint Network with 20 locations, followed by Tesla Destination with 1. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Canton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Canton

Canton, Georgia's EV charging landscape is predominantly shaped by the ChargePoint Network, which controls 83% of the city's 24 public charging locations, resulting in a high level of reliability and consistency for users. Notably, the city features two DC fast charging stations that provide a robust average output of 160 kW, with all fast stations rated 150 kW or higher—positioning them among the most powerful available. This concentration of fast charging options—comprising just 8% of total locations—highlights a significant opportunity for new providers to enhance the charging landscape, particularly with high-capacity units that can attract drivers looking for convenience and speed in their charging experience.

Canton charging by the numbers

Locations
24
Chargers
50
DC Fast locations
2
Level 2 locations
22

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.1. Average DC fast power: 160 kW.

Canton charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 5 networks.
Average DC fast power
160 kW (fastest stall: 160 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 24 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Canton

The following operators run public charging in Canton, ranked by number of locations.

Featured charging locations in Canton

A selection of higher-power public charging locations across Canton, sorted by power level.

  1. GEORGIA POWER CANTON DC1 — Canton, GA, 30114 (ChargePoint Network · DC Fast · 160 kW)
  2. GEORGIA POWER CANTON DC2 — Canton, GA, 30114 (ChargePoint Network · DC Fast · 160 kW)
  3. DD HSP — Canton, GA, 30115 (Blink Network · Level 2 · 17.3 kW)
  4. PIB ATLANTA LP ACCENT 1 — Canton, GA, 30114 (ChargePoint Network · Level 2 · 12 kW)
  5. Bedoe's Bar and Grille - Tesla Destination — Canton, GA, 30115 (Tesla Destination · Level 2 · 7.2 kW)
  6. Ingles — Canton, GA, 30114 (Non-Networked · Level 2 · 7.2 kW)
  7. City of Canton — Canton, GA, 30114 (ENVIROSPARK · Level 2 · 6.7 kW)
  8. NORTHSIDE EV STATION 0-1 0-2 — Canton, GA, 30115 (ChargePoint Network · Level 2 · 6.5 kW)
  9. NORTHSIDE EV NORTHSIDE EV4 — Canton, GA, 30115 (ChargePoint Network · Level 2 · 6.5 kW)
  10. NORTHSIDE EV NORTHSIDE EV3 — Canton, GA, 30114 (ChargePoint Network · Level 2 · 6.5 kW)
  11. NORTHSIDE EV STATION 0-3 0-4 — Canton, GA, 30115 (ChargePoint Network · Level 2 · 6.5 kW)
  12. NORTHSIDE EV STATION 6-1 6-2 — Canton, GA, 30115 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Canton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 22 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Canton, Georgia?
There are 24 public electric vehicle charging locations in Canton, Georgia, with a combined 50 individual chargers. 2 locations offer DC fast charging and 22 provide Level 2 charging.
What is the largest EV charging network in Canton?
ChargePoint Network operates the most public charging locations in Canton with 20 sites, followed by Tesla Destination with 1 sites.
How much does it cost to install an EV charger in Canton?
Level 2 EV chargers in Canton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Canton?
Most Canton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Canton?
A typical commercial Level 2 installation in Canton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Canton take to become profitable?
Payback in Canton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage