Install EV Chargers in Fairburn, Georgia

Install EV chargers or analyze a site in Fairburn, Georgia. 14 existing public charging locations (6 DC fast, 8 Level 2). Free 0–100 profitability score on any Fairburn address from EV Data Map by Charge Rigs.

Fairburn, Georgia is served by 14 public electric vehicle charging locations operating 34 individual chargers — an average of 2.4 chargers per site. Of those locations, 6 (43%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (57%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fairburn is ChargePoint Network with 10 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 147 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fairburn and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fairburn

Fairburn, Georgia offers a compelling electric vehicle charging landscape, dominated by ChargePoint Network, which operates 71% of the city's 14 public charging locations. With 43% of these being DC fast chargers, drivers can access a robust modern fleet, all exceeding 150 kW; notably, the average output stands at 160 kW, ensuring quick top-ups. This concentration under a single operator emphasizes the need for potential site developers to gauge network reliability and pricing. Additionally, the presence of varying charging types, with six fast ports supplemented by Level 2 options, creates a favorable ecosystem for both quick and longer-stay charging needs, making Fairburn an intriguing market for new entrants looking to optimize their infrastructure strategy.

Fairburn charging by the numbers

Locations
14
Chargers
34
DC Fast locations
6
Level 2 locations
8

DC fast share: 43% of locations. Level 2 share: 57%. Average chargers per site: 2.4. Average DC fast power: 147 kW.

Fairburn charging — local snapshot

Top operator share
ChargePoint Network runs 71% of public locations across 4 networks.
Average DC fast power
147 kW (fastest stall: 160 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
43% DC fast / 57% Level 2 across 14 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Fairburn

The following operators run public charging in Fairburn, ranked by number of locations.

Featured charging locations in Fairburn

A selection of higher-power public charging locations across Fairburn, sorted by power level.

  1. SIMAYN FAIRBURN DC 1 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 160 kW)
  2. OPTIMUS ENERGY FAIRBURN DC 03 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 160 kW)
  3. OPTIMUS ENERGY FAIRBURN DC 04 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 160 kW)
  4. SIMAYN FAIRBURN DC 2 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 160 kW)
  5. OPTIMUS ENERGY FAIRBURN DC 02 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 120 kW)
  6. OPTIMUS ENERGY FAIRBURN DC 01 — Fairburn, GA, 30213 (ChargePoint Network · DC Fast · 120 kW)
  7. EMPLOYEE PARK CHARGER 4 — Fairburn, GA, 30213 (ChargePoint Network · Level 2 · 19.2 kW)
  8. EMPLOYEE PARK CHARGER 2 — Fairburn, GA, 30213 (ChargePoint Network · Level 2 · 19.2 kW)
  9. EMPLOYEE PARK CHARGER 3 — Fairburn, GA, 30213 (ChargePoint Network · Level 2 · 19.2 kW)
  10. EMPLOYEE PARK CHARGER 1 — Fairburn, GA, 30213 (ChargePoint Network · Level 2 · 19.2 kW)
  11. City of Fairburn — Fairburn, GA, 30213 (NOODOE · Level 2 · 11.5 kW)
  12. Holiday Inn Express & Suites Atlanta Southwest-Fairburn, an IHG Hotel - Tesla Destination — Fairburn, GA, 30213 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Georgia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fairburn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fairburn, Georgia?
There are 14 public electric vehicle charging locations in Fairburn, Georgia, with a combined 34 individual chargers. 6 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Fairburn?
ChargePoint Network operates the most public charging locations in Fairburn with 10 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Fairburn?
Level 2 EV chargers in Fairburn typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fairburn?
Most Fairburn projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Georgia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fairburn?
A typical commercial Level 2 installation in Fairburn energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fairburn take to become profitable?
Payback in Fairburn depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage