Install EV Chargers in Champaign, Illinois

Install EV chargers or analyze a site in Champaign, Illinois. 55 existing public charging locations (7 DC fast, 48 Level 2). Free 0–100 profitability score on any Champaign address from EV Data Map by Charge Rigs.

Champaign, Illinois is served by 55 public electric vehicle charging locations operating 130 individual chargers — an average of 2.4 chargers per site. Of those locations, 7 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 48 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Champaign is ChargePoint Network with 38 locations, followed by Tesla Destination with 5. Average DC fast power across the city is approximately 214 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Champaign and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Champaign

Champaign, Illinois showcases a robust EV charging landscape with 55 public locations predominantly featuring ChargePoint Network, which operates 69% of these sites, ensuring consistent uptime and reliability. The city’s 7 DC fast charging stations, averaging 214 kW and peaking at an exceptional 360 kW, highlight a strong capability to meet high-demand driver needs. Notably, 71% of these fast chargers are rated 150 kW or higher, positioning them favorably in the local market and influencing navigational app preferences. With a significant portion of public charging dedicated to Level 2 stations, the infrastructure supports both short and longer dwell times, creating diverse options for EV users. Addressing the gaps highlighted by EV Data Map can yield opportunities for new market entrants.

Champaign charging by the numbers

Locations
55
Chargers
130
DC Fast locations
7
Level 2 locations
48

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 2.4. Average DC fast power: 214 kW.

Champaign charging — local snapshot

Top operator share
ChargePoint Network runs 69% of public locations across 10 networks.
Average DC fast power
214 kW (fastest stall: 360 kW)
High-power share
71% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 55 locations
Estimated DC ports
42 fast-charging ports city-wide

Charging networks in Champaign

The following operators run public charging in Champaign, ranked by number of locations.

Featured charging locations in Champaign

A selection of higher-power public charging locations across Champaign, sorted by power level.

  1. Beverly Plaza EV Lot — Champaign, IL, 61822 (RED_E · DC Fast · 360 kW)
  2. Meijer 146 (Champaign, IL) — Champaign, IL, 61822 (Electrify America · DC Fast · 350 kW)
  3. County Market - Tesla Supercharger — Champaign, IL, 61821 (Tesla · DC Fast · 250 kW)
  4. CircleK - Champaign, IL — Champaign, IL, 61822 (CIRCLE_K · DC Fast · 180 kW)
  5. Meijer - Tesla Supercharger — Champaign, IL, 61822 (Tesla · DC Fast · 150 kW)
  6. Champaign Ford City — Champaign, IL, 61822 (FORD_CHARGE · DC Fast · 120 kW)
  7. Americas Best Value Inn Champaign — Champaign, IL, 61821 (UNIVERSAL · DC Fast · 90 kW)
  8. Crowwood Pointe Apts — Champaign, IL, 61822 (Blink Network · Level 2 · 8.6 kW)
  9. Royse and Brinkmeyer - 2511 W. Springfield — Champaign, IL, 61820 (Blink Network · Level 2 · 8.6 kW)
  10. Illini Nissan — Champaign, IL, 61822 (Non-Networked · Level 2 · 7.2 kW)
  11. Home2 Suites By Hilton Champaign Urbana - Tesla Destination — Champaign, IL, 61820 (Tesla Destination · Level 2 · 7.2 kW)
  12. Campus Center Public Parking Deck - Tesla Destination — Champaign, IL, 61820 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Illinois we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Champaign specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 48 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Champaign, Illinois?
There are 55 public electric vehicle charging locations in Champaign, Illinois, with a combined 130 individual chargers. 7 locations offer DC fast charging and 48 provide Level 2 charging.
What is the largest EV charging network in Champaign?
ChargePoint Network operates the most public charging locations in Champaign with 38 sites, followed by Tesla Destination with 5 sites.
How much does it cost to install an EV charger in Champaign?
Level 2 EV chargers in Champaign typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Champaign?
Most Champaign projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Illinois state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Champaign?
A typical commercial Level 2 installation in Champaign energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Champaign take to become profitable?
Payback in Champaign depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage