Install EV Chargers in Hutchinson, Kansas

Install EV chargers or analyze a site in Hutchinson, Kansas. 10 existing public charging locations (3 DC fast, 7 Level 2). Free 0–100 profitability score on any Hutchinson address from EV Data Map by Charge Rigs.

Hutchinson, Kansas is served by 10 public electric vehicle charging locations operating 23 individual chargers — an average of 2.3 chargers per site. Of those locations, 3 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Hutchinson is ChargePoint Network with 4 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Hutchinson and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Hutchinson

Hutchinson boasts a competitive public EV charging landscape with a diverse array of six operators across ten locations, led by ChargePoint Network, which operates 40% of the sites. This diversity not only fosters competitive pricing and reliability but also encourages drivers to select charging stations based on power levels and available amenities rather than brand loyalty. With 30% of the locations featuring DC fast charging, averaging 160 kW, and boasting the potential for 240 kW at the fastest stall, Hutchinson's charging infrastructure is well-equipped to meet modern demands. Notably, 33% of the DC fast stations are rated at 150 kW or higher, positioning the city as an increasingly attractive option for EV drivers traveling through the area.

Hutchinson charging by the numbers

Locations
10
Chargers
23
DC Fast locations
3
Level 2 locations
7

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 2.3. Average DC fast power: 160 kW.

Hutchinson charging — local snapshot

Top operator share
ChargePoint Network runs 40% of public locations across 6 networks.
Average DC fast power
160 kW (fastest stall: 240 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 10 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Hutchinson

The following operators run public charging in Hutchinson, ranked by number of locations.

Featured charging locations in Hutchinson

A selection of higher-power public charging locations across Hutchinson, sorted by power level.

  1. Midwest Ford — Hutchinson, KS, 67502 (FORD_CHARGE · DC Fast · 240 kW)
  2. Roots Coffee Company — Hutchinson, KS, 67501 (Blink Network · DC Fast · 120 kW)
  3. Midway Motors Chevrolet of Hutchinson — Hutchinson, KS, 67502 (SYNERGEV · DC Fast · 120 kW)
  4. Hilton Garden Inn Hutchinson — Hutchinson, KS, 67502 (Blink Network · Level 2 · 16.6 kW)
  5. Sandhills Brewing - Tesla Destination — Hutchinson, KS, 67501 (Tesla Destination · Level 2 · 7.2 kW)
  6. Evergy - Hutchinson Electric Service Center — Hutchinson, KS, 67501 (Non-Networked · Level 2 · 7.2 kW)
  7. EVERGY @HUTCH HOS-415A — Hutchinson, KS, 67502 (ChargePoint Network · Level 2 · 6.5 kW)
  8. EVERGY @SALT MUS -410B — Hutchinson, KS, 67501 (ChargePoint Network · Level 2 · 6.5 kW)
  9. EVERGY @SALT MUS -410A — Hutchinson, KS, 67501 (ChargePoint Network · Level 2 · 6.5 kW)
  10. EVERGY @HUTCH HOS-415B — Hutchinson, KS, 67502 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Kansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Hutchinson specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Hutchinson, Kansas?
There are 10 public electric vehicle charging locations in Hutchinson, Kansas, with a combined 23 individual chargers. 3 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Hutchinson?
ChargePoint Network operates the most public charging locations in Hutchinson with 4 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Hutchinson?
Level 2 EV chargers in Hutchinson typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Hutchinson?
Most Hutchinson projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Hutchinson?
A typical commercial Level 2 installation in Hutchinson energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Hutchinson take to become profitable?
Payback in Hutchinson depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage