Install EV Chargers in Topeka, Kansas

Install EV chargers or analyze a site in Topeka, Kansas. 15 existing public charging locations (5 DC fast, 10 Level 2). Free 0–100 profitability score on any Topeka address from EV Data Map by Charge Rigs.

Topeka, Kansas is served by 15 public electric vehicle charging locations operating 44 individual chargers — an average of 2.9 chargers per site. Of those locations, 5 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Topeka is ChargePoint Network with 7 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 173 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Topeka and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Topeka

Topeka offers a robust public EV charging landscape with a total of 15 locations, of which 33% are DC fast chargers, providing drivers an efficient charging experience. With an impressive average power of 173 kW across fast chargers and 60% of these stations rated at 150 kW or higher, Topeka's facilities rank among the most powerful in the region. The presence of six distinct charging networks enhances competition, led by ChargePoint Network at nearly half of the sites, encouraging a focus on accessibility and uptime. This competitive environment allows EV drivers to strategically select chargers based on power capabilities and amenities, fostering a user-friendly experience in their journey through the city and beyond.

Topeka charging by the numbers

Locations
15
Chargers
44
DC Fast locations
5
Level 2 locations
10

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.9. Average DC fast power: 173 kW.

Topeka charging — local snapshot

Top operator share
ChargePoint Network runs 47% of public locations across 6 networks.
Average DC fast power
173 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 15 locations
Estimated DC ports
22 fast-charging ports city-wide

Charging networks in Topeka

The following operators run public charging in Topeka, ranked by number of locations.

Featured charging locations in Topeka

A selection of higher-power public charging locations across Topeka, sorted by power level.

  1. Walmart 1802 (Topeka, KS) — Topeka, KS, 66604 (Electrify America · DC Fast · 350 kW)
  2. Topeka Service Area - Tesla Supercharger — Topeka, KS, 66608 (Tesla · DC Fast · 250 kW)
  3. Arby's - Tesla Supercharger — Topeka, KS, 66604 (Tesla · DC Fast · 150 kW)
  4. EVERGY @TOPEKA GO-442A — Topeka, KS, 66612 (ChargePoint Network · DC Fast · 62.5 kW)
  5. SHARP DC FAST 01 — Topeka, KS, 66611 (ChargePoint Network · DC Fast · 50 kW)
  6. ED Bozarth Chevrolet — Topeka, KS, 66609 (Blink Network · Level 2 · 21.6 kW)
  7. Evergy - Topeka General Office — Topeka, KS, 66612 (Non-Networked · Level 2 · 7.2 kW)
  8. Evergy - Topeka Operations Center — Topeka, KS, 66618 (Non-Networked · Level 2 · 7.2 kW)
  9. Evergy - Professional Development Center — Topeka, KS, 66608 (Non-Networked · Level 2 · 7.2 kW)
  10. Homewood Suites Topeka - Tesla Destination — Topeka, KS, 66604 (Tesla Destination · Level 2 · 7.2 kW)
  11. SHARP STATION SE — Topeka, KS, 66611 (ChargePoint Network · Level 2 · 6.5 kW)
  12. RES OF AH CHARG AUBURNHILLSCHG1 — Topeka, KS, 66614 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Kansas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Topeka specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Topeka, Kansas?
There are 15 public electric vehicle charging locations in Topeka, Kansas, with a combined 44 individual chargers. 5 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Topeka?
ChargePoint Network operates the most public charging locations in Topeka with 7 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Topeka?
Level 2 EV chargers in Topeka typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Topeka?
Most Topeka projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kansas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Topeka?
A typical commercial Level 2 installation in Topeka energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Topeka take to become profitable?
Payback in Topeka depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage