Install EV Chargers in Lexington, Kentucky

Install EV chargers or analyze a site in Lexington, Kentucky. 33 existing public charging locations (7 DC fast, 26 Level 2). Free 0–100 profitability score on any Lexington address from EV Data Map by Charge Rigs.

Lexington, Kentucky is served by 33 public electric vehicle charging locations operating 99 individual chargers — an average of 3.0 chargers per site. Of those locations, 7 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 26 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lexington is ChargePoint Network with 17 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 141 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lexington and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lexington

Lexington boasts a competitive public charging landscape with 33 locations, featuring a remarkable 21% dedicated to DC fast charging. The average power output of 152 kW across these fast chargers, complemented by a top stall offering 250 kW, positions the city favorably in terms of high-power availability. Notably, 86% of the DC fast sites are classified as 150 kW or higher, appealing to drivers prioritizing quick charges. With 9 distinct charging networks, led by ChargePoint Network at 52% of the sites, users benefit from diverse options that enhance pricing competition and uptime reliability. This unique mix encourages strategic site selection based on power and amenities, as Lexington continues to adapt to the evolving needs of EV drivers.

Lexington charging by the numbers

Locations
33
Chargers
99
DC Fast locations
7
Level 2 locations
26

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.0. Average DC fast power: 141 kW.

Lexington charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 9 networks.
Average DC fast power
141 kW (fastest stall: 250 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 33 locations
Estimated DC ports
39 fast-charging ports city-wide

Charging networks in Lexington

The following operators run public charging in Lexington, ranked by number of locations.

Featured charging locations in Lexington

A selection of higher-power public charging locations across Lexington, sorted by power level.

  1. Meijer - Tesla Supercharger — Lexington, KY, 40503 (Tesla · DC Fast · 250 kW)
  2. OUTSIDE 1 HYLVL3INV — Lexington, KY, 40515 (ChargePoint Network · DC Fast · 160 kW)
  3. OUTSIDE 1 HYLVL3SIDE — Lexington, KY, 40509 (ChargePoint Network · DC Fast · 160 kW)
  4. Meijer Store #161 - Tesla Supercharger — Lexington, KY, 40509 (Tesla · DC Fast · 150 kW)
  5. OUTSIDE 1 GSPARKINGLVL3RS — Lexington, KY, 40509 (ChargePoint Network · DC Fast · 120 kW)
  6. OUTSIDE 1 GSPARKINGLVL3LS — Lexington, KY, 40509 (ChargePoint Network · DC Fast · 120 kW)
  7. The Manchester — Lexington, KY, 40508 (DIRT_ROAD · DC Fast · 24 kW)
  8. OBE EMBASSY LEXIN R — Lexington, KY, 40511 (ChargePoint Network · Level 2 · 13.4 kW)
  9. OBE EMBASSY LEXIN L — Lexington, KY, 40511 (ChargePoint Network · Level 2 · 13.4 kW)
  10. THE FLATS @ 345 FLATS EV 1 — Lexington, KY, 40508 (ChargePoint Network · Level 2 · 12 kW)
  11. THE FLATS @ 345 FLATS EV 2 — Lexington, KY, 40508 (ChargePoint Network · Level 2 · 12 kW)
  12. Home2 Suites by Hilton Lexington Keeneland Airport — Lexington, KY, 40513 (UNIVERSAL · Level 2 · 11.2 kW)

Nearby cities with EV charging coverage

Other cities in Kentucky we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lexington specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 26 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lexington, Kentucky?
There are 33 public electric vehicle charging locations in Lexington, Kentucky, with a combined 99 individual chargers. 7 locations offer DC fast charging and 26 provide Level 2 charging.
What is the largest EV charging network in Lexington?
ChargePoint Network operates the most public charging locations in Lexington with 17 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Lexington?
Level 2 EV chargers in Lexington typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lexington?
Most Lexington projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kentucky state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lexington?
A typical commercial Level 2 installation in Lexington energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lexington take to become profitable?
Payback in Lexington depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.