Install EV Chargers in Richmond, Kentucky

Install EV chargers or analyze a site in Richmond, Kentucky. 14 existing public charging locations (8 DC fast, 6 Level 2). Free 0–100 profitability score on any Richmond address from EV Data Map by Charge Rigs.

Richmond, Kentucky is served by 14 public electric vehicle charging locations operating 43 individual chargers — an average of 3.1 chargers per site. Of those locations, 8 (57%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (43%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Richmond is MERCEDES_BENZ with 5 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 319 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Richmond and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Richmond

Richmond, Kentucky boasts a robust public charging landscape with a competitive mix of 14 locations featuring eight distinct operators, including the dominant MERCEDES_BENZ with 36% of the sites. Notably, 57% of these charging points are DC fast options, averaging an impressive 319 kW and peaking at 400 kW. With 88% of DC fast locations classified as 150 kW or higher, Richmond’s infrastructure is well-suited for drivers seeking rapid charging solutions. The city’s diverse operator landscape, complemented by both fast and Level 2 charging options, allows EV users to prioritize power and amenities. This nuanced choice encourages strategic site selection that aligns with driver preferences, paving the way for further growth in EV infrastructure in the region.

Richmond charging by the numbers

Locations
14
Chargers
43
DC Fast locations
8
Level 2 locations
6

DC fast share: 57% of locations. Level 2 share: 43%. Average chargers per site: 3.1. Average DC fast power: 319 kW.

Richmond charging — local snapshot

Top operator share
MERCEDES_BENZ runs 36% of public locations across 8 networks.
Average DC fast power
319 kW (fastest stall: 400 kW)
High-power share
88% of DC fast sites are 150 kW-class or higher
Mix
57% DC fast / 43% Level 2 across 14 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Richmond

The following operators run public charging in Richmond, ranked by number of locations.

Featured charging locations in Richmond

A selection of higher-power public charging locations across Richmond, sorted by power level.

  1. MB BUCEES RICHMOND 1-2 — Richmond, KY, 40475 (MERCEDES_BENZ · DC Fast · 400 kW)
  2. MB BUCEES RICHMOND 9-10 — Richmond, KY, 40475 (MERCEDES_BENZ · DC Fast · 400 kW)
  3. MB BUCEES RICHMOND 3-4 — Richmond, KY, 40475 (MERCEDES_BENZ · DC Fast · 400 kW)
  4. MB BUCEES RICHMOND 5-6 — Richmond, KY, 40475 (MERCEDES_BENZ · DC Fast · 400 kW)
  5. MB BUCEES RICHMOND 7-8 — Richmond, KY, 40475 (MERCEDES_BENZ · DC Fast · 400 kW)
  6. Buc-ee's - Tesla Supercharger — Richmond, KY, 40475 (Tesla · DC Fast · 250 kW)
  7. CircleK - Richmond, KY — Richmond, KY, 40475 (CIRCLE_K · DC Fast · 180 kW)
  8. Gates Hyundai — Richmond, KY, 40475 (Blink Network · DC Fast · 120 kW)
  9. Adams Buick GMC Truck — RICHMOND, KY, 40475 (EV Connect · Level 2 · 19.2 kW)
  10. TownePlace Suites by Marriott - Richmond - Tesla Destination — Richmond, KY, 40475 (Tesla Destination · Level 2 · 7.2 kW)
  11. Telford Community Center YMCA — Richmond, KY, 40475 (Non-Networked · Level 2 · 7.2 kW)
  12. Eastern Kentucky University Parking Garage — Richmond, KY, 40475 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Kentucky we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Richmond specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Richmond, Kentucky?
There are 14 public electric vehicle charging locations in Richmond, Kentucky, with a combined 43 individual chargers. 8 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Richmond?
MERCEDES_BENZ operates the most public charging locations in Richmond with 5 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Richmond?
Level 2 EV chargers in Richmond typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Richmond?
Most Richmond projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Kentucky state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Richmond?
A typical commercial Level 2 installation in Richmond energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Richmond take to become profitable?
Payback in Richmond depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage