Install EV chargers or analyze a site in Metairie, Louisiana. 14 existing public charging locations (8 DC fast, 6 Level 2). Free 0–100 profitability score on any Metairie address from EV Data Map by Charge Rigs.
Metairie, Louisiana is served by 14 public electric vehicle charging locations operating 49 individual chargers — an average of 3.5 chargers per site. Of those locations, 8 (57%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (43%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Metairie is ChargePoint Network with 5 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 124 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Metairie and receive an instant ROI score, demand projection, and recommended charger configuration.
Metairie boasts a robust public charging landscape, characterized by a competitive mix of seven distinct operators across 14 locations, with ChargePoint Network leading at 36% market share. This variety enables drivers to select charging stations based on power and amenities rather than relying on a single provider. With 57% of locations offering DC fast charging, the average power output stands at 124 kW, complemented by a standout site delivering 325 kW. Notably, a quarter of DC fast installations are 150 kW or higher, positioning new entrants with similar capabilities to capture demand. This infrastructure not only facilitates efficient charging for local EV users but also informs strategic planning for future developments in Metairie, ensuring gaps are addressed to enhance overall service.
DC fast share: 57% of locations. Level 2 share: 43%. Average chargers per site: 3.5. Average DC fast power: 124 kW.
The following operators run public charging in Metairie, ranked by number of locations.
A selection of higher-power public charging locations across Metairie, sorted by power level.
Other cities in Louisiana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Metairie specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.