Install EV Chargers in Shreveport, Louisiana

Install EV chargers or analyze a site in Shreveport, Louisiana. 10 existing public charging locations (2 DC fast, 8 Level 2). Free 0–100 profitability score on any Shreveport address from EV Data Map by Charge Rigs.

Shreveport, Louisiana is served by 10 public electric vehicle charging locations operating 22 individual chargers — an average of 2.2 chargers per site. Of those locations, 2 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Shreveport is ChargePoint Network with 7 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 135 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Shreveport and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Shreveport

Shreveport's EV charging landscape offers a unique opportunity for developers, with ChargePoint Network commanding a significant presence at 70% of the city's 10 public charging locations. This consolidation ensures a reliable experience for users, but also highlights a competitive edge for new entrants willing to introduce faster hardware; half of the city's DC fast stations are 150 kW-class or higher, making them more appealing for on-the-go drivers. With only 20% of public stations featuring DC fast charging, there is room to enhance fast charging options in the area, particularly for operators offering 150–350 kW stations to attract more users and fill existing service gaps.

Shreveport charging by the numbers

Locations
10
Chargers
22
DC Fast locations
2
Level 2 locations
8

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 2.2. Average DC fast power: 135 kW.

Shreveport charging — local snapshot

Top operator share
ChargePoint Network runs 70% of public locations across 4 networks.
Average DC fast power
135 kW (fastest stall: 150 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 10 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Shreveport

The following operators run public charging in Shreveport, ranked by number of locations.

Featured charging locations in Shreveport

A selection of higher-power public charging locations across Shreveport, sorted by power level.

  1. Mall St. Vincent - Tesla Supercharger — Shreveport, LA, 71104 (Tesla · DC Fast · 150 kW)
  2. Mike Morgan Hyundai — Shreveport, LA, 71105 (Blink Network · DC Fast · 120 kW)
  3. LSUS STATION #5 — Shreveport, LA, 71115 (ChargePoint Network · Level 2 · 12 kW)
  4. LSUS STATION 1 — Shreveport, LA, 71115 (ChargePoint Network · Level 2 · 12 kW)
  5. LSUS STATION #4 — Shreveport, LA, 71115 (ChargePoint Network · Level 2 · 12 kW)
  6. LSUS STATION #2 — Shreveport, LA, 71115 (ChargePoint Network · Level 2 · 12 kW)
  7. LSUS STATION #3 — Shreveport, LA, 71115 (ChargePoint Network · Level 2 · 12 kW)
  8. Orr Nissan South — Shreveport, LA, 71105 (Non-Networked · Level 2 · 7.2 kW)
  9. YOKEM1 DELIVERY CT4K — Shreveport, LA, 71105 (ChargePoint Network · Level 2 · 6.5 kW)
  10. SIGNATURE AVIAT SIGNATURE AVIAT — Shreveport, LA, 71109 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Louisiana we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Shreveport specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Shreveport, Louisiana?
There are 10 public electric vehicle charging locations in Shreveport, Louisiana, with a combined 22 individual chargers. 2 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Shreveport?
ChargePoint Network operates the most public charging locations in Shreveport with 7 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Shreveport?
Level 2 EV chargers in Shreveport typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Shreveport?
Most Shreveport projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Louisiana state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Shreveport?
A typical commercial Level 2 installation in Shreveport energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Shreveport take to become profitable?
Payback in Shreveport depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.