Install EV Chargers in Brunswick, Maine

Install EV chargers or analyze a site in Brunswick, Maine. 18 existing public charging locations (5 DC fast, 13 Level 2). Free 0–100 profitability score on any Brunswick address from EV Data Map by Charge Rigs.

Brunswick, Maine is served by 18 public electric vehicle charging locations operating 58 individual chargers — an average of 3.2 chargers per site. Of those locations, 5 (28%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (72%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Brunswick is ChargePoint Network with 10 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 70 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Brunswick and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Brunswick

Brunswick's charging landscape is marked by a competitive mix of 18 public locations, with a notable 28% offering DC fast charging. The presence of five distinct operators, led by ChargePoint Network, fosters a dynamic environment where pricing and uptime are kept competitive, allowing users to prioritize power and amenities over brand loyalty. With an average DC fast power output of 70 kW and 20% of fast sites at 150 kW or higher, Brunswick’s charging options cater to a range of driver needs. This balance of infrastructure positions Brunswick as an attractive location for EV users, who can leverage the city's diverse offerings and use tools like EV Data Map to identify ideal charging spots based on traffic and demographic insights.

Brunswick charging by the numbers

Locations
18
Chargers
58
DC Fast locations
5
Level 2 locations
13

DC fast share: 28% of locations. Level 2 share: 72%. Average chargers per site: 3.2. Average DC fast power: 70 kW.

Brunswick charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 5 networks.
Average DC fast power
70 kW (fastest stall: 150 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
28% DC fast / 72% Level 2 across 18 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Brunswick

The following operators run public charging in Brunswick, ranked by number of locations.

Featured charging locations in Brunswick

A selection of higher-power public charging locations across Brunswick, sorted by power level.

  1. 11 Seahawk Ave Parking Lot — Brunswick, ME, 04011 (Non-Networked · DC Fast · 150 kW)
  2. HYN LEVEL 3 RIGHT — Brunswick, ME, 04011 (ChargePoint Network · DC Fast · 62.5 kW)
  3. HYN LEVEL 3 LEFT — Brunswick, ME, 04011 (ChargePoint Network · DC Fast · 62.5 kW)
  4. Bill Dodge Hyundai — Brunswick, ME, 04011 (Non-Networked · DC Fast · 50 kW)
  5. Goodwin Chevrolet Brunswick — Brunswick, ME, 04011 (Non-Networked · DC Fast · 25 kW)
  6. Atlantic Pointe — Brunswick, ME, 04011 (EVIUM · Level 2 · 9.6 kW)
  7. The Nature Conservancy — Brunswick, ME, 04011 (Non-Networked · Level 2 · 7.2 kW)
  8. Flight Deck Brewing - Tesla Destination — Brunswick, ME, 04011 (Tesla Destination · Level 2 · 7.2 kW)
  9. Darling's Brunswick Ford — Brunswick, ME, 04011 (Non-Networked · Level 2 · 7.2 kW)
  10. TOWN BRUNSWICK STATION 1 — Brunswick, ME, 04011 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BOWDOIN 6 POLAR LOOP — Brunswick, ME, 04011 (ChargePoint Network · Level 2 · 6.5 kW)
  12. ADDISON RIDGE STATION 2 — Brunswick, ME, 04011 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Maine we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Brunswick specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 13 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Brunswick, Maine?
There are 18 public electric vehicle charging locations in Brunswick, Maine, with a combined 58 individual chargers. 5 locations offer DC fast charging and 13 provide Level 2 charging.
What is the largest EV charging network in Brunswick?
ChargePoint Network operates the most public charging locations in Brunswick with 10 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Brunswick?
Level 2 EV chargers in Brunswick typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Brunswick?
Most Brunswick projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maine state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Brunswick?
A typical commercial Level 2 installation in Brunswick energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Brunswick take to become profitable?
Payback in Brunswick depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.