Install EV chargers or analyze a site in Aberdeen, Maryland. 12 existing public charging locations (6 DC fast, 6 Level 2). Free 0–100 profitability score on any Aberdeen address from EV Data Map by Charge Rigs.
Aberdeen, Maryland is served by 12 public electric vehicle charging locations operating 66 individual chargers — an average of 5.5 chargers per site. Of those locations, 6 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Aberdeen is ChargePoint Network with 4 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 145 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Aberdeen and receive an instant ROI score, demand projection, and recommended charger configuration.
Aberdeen boasts a robust public charging landscape with 12 sites operated by five distinct networks, fostering competitive pricing and uptime. With 50% of charging locations featuring DC fast chargers averaging 145 kW—including a standout stall at 250 kW—drivers can find ample high-speed options tailored to their needs. Notably, half of the DC fast sites are 150 kW-class or higher, appealing to users prioritizing faster charge times, which may influence their route planning. ChargePoint Network dominates the scene, accounting for a third of the sites, yet the presence of other operators allows EV owners to optimize their charging experience based on power levels and amenities. With a combination of resources, Aberdeen's infrastructure supports a growing EV community while identifying opportunities to enhance future offerings.
DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 5.5. Average DC fast power: 145 kW.
The following operators run public charging in Aberdeen, ranked by number of locations.
A selection of higher-power public charging locations across Aberdeen, sorted by power level.
Other cities in Maryland we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Aberdeen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.