Install EV Chargers in Aberdeen, Maryland

Install EV chargers or analyze a site in Aberdeen, Maryland. 12 existing public charging locations (6 DC fast, 6 Level 2). Free 0–100 profitability score on any Aberdeen address from EV Data Map by Charge Rigs.

Aberdeen, Maryland is served by 12 public electric vehicle charging locations operating 66 individual chargers — an average of 5.5 chargers per site. Of those locations, 6 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Aberdeen is ChargePoint Network with 4 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 145 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Aberdeen and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Aberdeen

Aberdeen boasts a diverse public charging landscape with 12 locations shared among five distinct operators, led by ChargePoint Network, which maintains a competitive 33% market share. This variety allows EV drivers to choose based on power and amenities rather than brand loyalty. With half of the city's six DC fast charging sites rated at 150 kW or above and the fastest power output reaching 250 kW, Aberdeen positions itself well within the mid-power range compared to national standards. Moreover, the balance of charging options—50% DC fast and 50% Level 2—caters to both quick stops and longer dwell times, ensuring that the unique needs of different drivers are met efficiently.

Aberdeen charging by the numbers

Locations
12
Chargers
66
DC Fast locations
6
Level 2 locations
6

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 5.5. Average DC fast power: 145 kW.

Aberdeen charging — local snapshot

Top operator share
ChargePoint Network runs 33% of public locations across 5 networks.
Average DC fast power
145 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 12 locations
Estimated DC ports
36 fast-charging ports city-wide

Charging networks in Aberdeen

The following operators run public charging in Aberdeen, ranked by number of locations.

Featured charging locations in Aberdeen

A selection of higher-power public charging locations across Aberdeen, sorted by power level.

  1. Wawa - Tesla Supercharger — Aberdeen, MD, 21001 (Tesla · DC Fast · 250 kW)
  2. Royal Farms - Tesla Supercharger — Aberdeen, MD, 21001 (Tesla · DC Fast · 250 kW)
  3. Maryland House Travel Plaza - Tesla Supercharger — Aberdeen, MD, 21001 (Tesla · DC Fast · 150 kW)
  4. Preston Motor - DCFC — Aberdeen, MD, 21001 (Blink Network · DC Fast · 120 kW)
  5. Maryland House Travel Plaza — Aberdeen, MD, 21001 (Non-Networked · DC Fast · 50 kW)
  6. EVsmart - BGE - Ripken Stadium — Aberdeen, MD, 21001 (SWTCH · DC Fast · 50 kW)
  7. EVsmart - BGE - Aberdeen Festival Park — Aberdeen, MD, 21001 (SWTCH · Level 2 · 7.2 kW)
  8. FIELDSIDEGRANDE FG3 — Aberdeen, MD, 21001 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FIELDSIDEGRANDE FG6 — Aberdeen, MD, 21001 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FIELDSIDEGRANDE FG4 — Aberdeen, MD, 21001 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FIELDSIDEGRANDE FG5 — Aberdeen, MD, 21001 (ChargePoint Network · Level 2 · 6.5 kW)
  12. The Yards at Fieldside Village — Aberdeen, MD, 21001 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Maryland we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Aberdeen specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Aberdeen, Maryland?
There are 12 public electric vehicle charging locations in Aberdeen, Maryland, with a combined 66 individual chargers. 6 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Aberdeen?
ChargePoint Network operates the most public charging locations in Aberdeen with 4 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in Aberdeen?
Level 2 EV chargers in Aberdeen typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Aberdeen?
Most Aberdeen projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maryland state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Aberdeen?
A typical commercial Level 2 installation in Aberdeen energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Aberdeen take to become profitable?
Payback in Aberdeen depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.