Install EV Chargers in Laurel, Maryland

Install EV chargers or analyze a site in Laurel, Maryland. 32 existing public charging locations (4 DC fast, 28 Level 2). Free 0–100 profitability score on any Laurel address from EV Data Map by Charge Rigs.

Laurel, Maryland is served by 32 public electric vehicle charging locations operating 103 individual chargers — an average of 3.2 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Laurel is ChargePoint Network with 11 locations, followed by Blink Network with 10. Average DC fast power across the city is approximately 244 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Laurel and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Laurel

Laurel distinguishes itself with a robust public charging landscape, featuring 32 locations serviced by seven distinct operators, ensuring competitive pricing and uptime for EV drivers. ChargePoint Network leads the market with 34% of these sites, while an impressive 13% of charging options are DC fast, averaging 244 kW in power, with a peak at 325 kW. Every DC fast station is at least 150 kW-class, catering to high-demand users and enhancing the area's appeal as a corridor destination. This combination of diverse operators and high-capacity charging ports encourages drivers to select stations based on power and amenities, creating a nuanced and dynamic charging environment that balances immediate needs with longer dwell-time solutions through Level 2 options.

Laurel charging by the numbers

Locations
32
Chargers
103
DC Fast locations
4
Level 2 locations
28

DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 3.2. Average DC fast power: 244 kW.

Laurel charging — local snapshot

Top operator share
ChargePoint Network runs 34% of public locations across 7 networks.
Average DC fast power
244 kW (fastest stall: 325 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 32 locations
Estimated DC ports
34 fast-charging ports city-wide

Charging networks in Laurel

The following operators run public charging in Laurel, ranked by number of locations.

Featured charging locations in Laurel

A selection of higher-power public charging locations across Laurel, sorted by power level.

  1. Shoppers - Tesla Supercharger — Laurel, MD, 20707 (Tesla · DC Fast · 325 kW)
  2. Royal Farms - Tesla Supercharger — Laurel, MD, 20707 (Tesla · DC Fast · 250 kW)
  3. Wawa - Tesla Supercharger — Laurel, MD, 20707 (Tesla · DC Fast · 250 kW)
  4. Towne Center at Laurel - Tesla Supercharger — Laurel, MD, 20707 (Tesla · DC Fast · 150 kW)
  5. Laurel Municipal Center — Laurel, MD, 20707 (Blink Network · Level 2 · 21.6 kW)
  6. 13401 Baltimore Avenue — Laurel, MD, 20707 (EV Connect · Level 2 · 19 kW)
  7. Robert J. DiPietro Community Center — Laurel, MD, 20707 (Blink Network · Level 2 · 13.5 kW)
  8. Community Center Parking Lot — Laurel, MD, 20707 (Blink Network · Level 2 · 13 kW)
  9. WSSC WSSC/RGH 10 — Laurel, MD, 20707 (ChargePoint Network · Level 2 · 11.5 kW)
  10. WSSC WSSC/RGH 13 — Laurel, MD, 20707 (ChargePoint Network · Level 2 · 11.5 kW)
  11. WSSC WSSC/RGH 12 — Laurel, MD, 20707 (ChargePoint Network · Level 2 · 11.5 kW)
  12. Public Parking Lot — Laurel, MD, 20707 (Blink Network · Level 2 · 10.8 kW)

Nearby cities with EV charging coverage

Other cities in Maryland we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Laurel specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Laurel, Maryland?
There are 32 public electric vehicle charging locations in Laurel, Maryland, with a combined 103 individual chargers. 4 locations offer DC fast charging and 28 provide Level 2 charging.
What is the largest EV charging network in Laurel?
ChargePoint Network operates the most public charging locations in Laurel with 11 sites, followed by Blink Network with 10 sites.
How much does it cost to install an EV charger in Laurel?
Level 2 EV chargers in Laurel typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Laurel?
Most Laurel projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maryland state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Laurel?
A typical commercial Level 2 installation in Laurel energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Laurel take to become profitable?
Payback in Laurel depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage