Install EV Chargers in Rockville, Maryland

Install EV chargers or analyze a site in Rockville, Maryland. 83 existing public charging locations (7 DC fast, 76 Level 2). Free 0–100 profitability score on any Rockville address from EV Data Map by Charge Rigs.

Rockville, Maryland is served by 83 public electric vehicle charging locations operating 243 individual chargers — an average of 2.9 chargers per site. Of those locations, 7 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 76 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Rockville is ChargePoint Network with 40 locations, followed by Blink Network with 26. Average DC fast power across the city is approximately 74 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Rockville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Rockville

Rockville's EV charging landscape is marked by a competitive mix of 83 public charging locations operated by 9 distinct networks, with ChargePoint Network leading at nearly half the sites. This variety encourages drivers to choose charging options based on power and amenities rather than brand loyalty. While the city hosts 7 DC fast charging locations averaging 74 kW, with a maximum of 150 kW, their relatively older infrastructure highlights a potential opportunity for new, higher-capacity stations. With only 8% of site locations offering fast charging, the majority caters to longer dwell periods, indicating a demand for diversified charging solutions. Analyzing Rockville's footprint against nearby cities can reveal gaps in service and infrastructure that are ripe for development.

Rockville charging by the numbers

Locations
83
Chargers
243
DC Fast locations
7
Level 2 locations
76

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.9. Average DC fast power: 74 kW.

Rockville charging — local snapshot

Top operator share
ChargePoint Network runs 48% of public locations across 9 networks.
Average DC fast power
74 kW (fastest stall: 150 kW)
High-power share
14% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 83 locations
Estimated DC ports
19 fast-charging ports city-wide

Charging networks in Rockville

The following operators run public charging in Rockville, ranked by number of locations.

Featured charging locations in Rockville

A selection of higher-power public charging locations across Rockville, sorted by power level.

  1. EVsmart - Pepco - Cabin John Ice Rink — Rockville, MD, 20852 (SWTCH · DC Fast · 150 kW)
  2. Pike & Rose 3 — Rockville, MD, 20852 (eVgo Network · DC Fast · 100 kW)
  3. Rockville Town Square - Tesla Supercharger — Rockville, MD, 20850 (Tesla · DC Fast · 72 kW)
  4. Woodley Gardens Shopping — Rockville, MD, 20850 (eVgo Network · DC Fast · 50 kW)
  5. NISSAN ROCKVILL NIS ROCK SALES — Rockville, MD, 20855 (ChargePoint Network · DC Fast · 50 kW)
  6. EVsmart - Pepco - Thomas Farm Community Center — Rockville, MD, 20850 (SWTCH · DC Fast · 50 kW)
  7. Darcars Nissan — Rockville, MD, 20855 (Non-Networked · DC Fast · 44 kW)
  8. HEBRON 121 THE GALVAN — Rockville, MD, 20852 (ChargePoint Network · Level 2 · 19.2 kW)
  9. 2000 Tower Oaks Blvd. — Rockville, MD, 20852 (VIALYNK · Level 2 · 19.2 kW)
  10. (NIAID) National Institute of Allergy and infectious Diseases — Rockville, MD, 20852 (Blink Network · Level 2 · 16.6 kW)
  11. Ingleside at King Farm — Rockville, MD, 20850 (Blink Network · Level 2 · 11.5 kW)
  12. Kaiser Permanente - Shady Grove - MD210-1 — Rockville, MD, 20850 (Blink Network · Level 2 · 11.5 kW)

Nearby cities with EV charging coverage

Other cities in Maryland we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Rockville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 76 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Rockville, Maryland?
There are 83 public electric vehicle charging locations in Rockville, Maryland, with a combined 243 individual chargers. 7 locations offer DC fast charging and 76 provide Level 2 charging.
What is the largest EV charging network in Rockville?
ChargePoint Network operates the most public charging locations in Rockville with 40 sites, followed by Blink Network with 26 sites.
How much does it cost to install an EV charger in Rockville?
Level 2 EV chargers in Rockville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Rockville?
Most Rockville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Maryland state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Rockville?
A typical commercial Level 2 installation in Rockville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Rockville take to become profitable?
Payback in Rockville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage