Install EV chargers or analyze a site in Waldorf, Maryland. 14 existing public charging locations (6 DC fast, 8 Level 2). Free 0–100 profitability score on any Waldorf address from EV Data Map by Charge Rigs.
Waldorf, Maryland is served by 14 public electric vehicle charging locations operating 37 individual chargers — an average of 2.6 chargers per site. Of those locations, 6 (43%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (57%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Waldorf is SWTCH with 8 locations, followed by EV Connect with 1. Average DC fast power across the city is approximately 95 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Waldorf and receive an instant ROI score, demand projection, and recommended charger configuration.
Waldorf, Maryland, boasts a competitive EV charging landscape with 14 public locations, including 6 DC fast chargers averaging 95 kW, and a notable 43% share of fast charging sites. This diverse market, featuring 7 distinct operators—with SWTCH leading at 57%—not only promotes competitive pricing and uptime but also encourages nuanced decision-making for drivers. While 17% of DC fast chargers are 150 kW-class or higher, signaling a slightly aging fleet, the presence of a 250 kW stall positions Waldorf as a potential hub for high-demand users. The combination of fast and Level 2 chargers offers flexibility for various charging needs, indicating an evolving infrastructure that aligns with regional trends and demographic requirements.
DC fast share: 43% of locations. Level 2 share: 57%. Average chargers per site: 2.6. Average DC fast power: 95 kW.
The following operators run public charging in Waldorf, ranked by number of locations.
A selection of higher-power public charging locations across Waldorf, sorted by power level.
Other cities in Maryland we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Waldorf specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.