Install EV chargers or analyze a site in Scituate, Massachusetts. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Scituate address from EV Data Map by Charge Rigs.
Scituate, Massachusetts is served by 12 public electric vehicle charging locations operating 22 individual chargers — an average of 1.8 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Scituate is ChargePoint Network with 12 locations. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Scituate and receive an instant ROI score, demand projection, and recommended charger configuration.
Scituate, Massachusetts, showcases a concentrated EV charging landscape, with ChargePoint Network operating all 12 public charging locations, ensuring a consistent user experience in terms of reliability and pricing. Notably, the 2 DC fast charging stations, which make up 17% of the total, average an impressive 250 kW, positioning them among the fastest in the region. This high power level, coupled with 100% of DC fast sites classified at 150 kW or higher, presents an opportunity for newer sites to attract drivers by providing competitive charging speeds. Additionally, the presence of only one operator shapes the market dynamics, making it essential for prospective developers to consider how to differentiate their offerings in a concentrated environment where uptime and compatibility are critical for consumer choices.
DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 1.8. Average DC fast power: 250 kW.
The following operators run public charging in Scituate, ranked by number of locations.
A selection of higher-power public charging locations across Scituate, sorted by power level.
Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Scituate specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.