Install EV Chargers in Scituate, Massachusetts

Install EV chargers or analyze a site in Scituate, Massachusetts. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Scituate address from EV Data Map by Charge Rigs.

Scituate, Massachusetts is served by 12 public electric vehicle charging locations operating 22 individual chargers — an average of 1.8 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Scituate is ChargePoint Network with 12 locations. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Scituate and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Scituate

Scituate, Massachusetts, showcases a concentrated EV charging landscape, with ChargePoint Network operating all 12 public charging locations, ensuring a consistent user experience in terms of reliability and pricing. Notably, the 2 DC fast charging stations, which make up 17% of the total, average an impressive 250 kW, positioning them among the fastest in the region. This high power level, coupled with 100% of DC fast sites classified at 150 kW or higher, presents an opportunity for newer sites to attract drivers by providing competitive charging speeds. Additionally, the presence of only one operator shapes the market dynamics, making it essential for prospective developers to consider how to differentiate their offerings in a concentrated environment where uptime and compatibility are critical for consumer choices.

Scituate charging by the numbers

Locations
12
Chargers
22
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 1.8. Average DC fast power: 250 kW.

Scituate charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Scituate

The following operators run public charging in Scituate, ranked by number of locations.

Featured charging locations in Scituate

A selection of higher-power public charging locations across Scituate, sorted by power level.

  1. CCO DRIFTWAY 1 — Scituate, MA, 02066 (ChargePoint Network · DC Fast · 250 kW)
  2. CCO DRIFTWAY 2 — Scituate, MA, 02066 (ChargePoint Network · DC Fast · 250 kW)
  3. TOWN HALL HIGH SCHOOL #2 — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  4. SKYSAIL SKYSAIL_E_EV — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  5. SKYSAIL SKYSAIL_B_EV — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  6. TOWN HALL HIGH SCHOOL #1 — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  7. SKYSAIL SKYSAIL_D_EV — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  8. TOWN HALL TOWN HALL 2N — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  9. TOWN HALL NEW TOWN HALL 1 — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  10. TOWN HALL LIBRARY #2 — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  11. TOWN HALL LIBRARY #1 — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)
  12. SKYSAIL SKYSAIL_C_EV — Scituate, MA, 02066 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Scituate specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Scituate, Massachusetts?
There are 12 public electric vehicle charging locations in Scituate, Massachusetts, with a combined 22 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Scituate?
ChargePoint Network operates the most public charging locations in Scituate with 12 sites.
How much does it cost to install an EV charger in Scituate?
Level 2 EV chargers in Scituate typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Scituate?
Most Scituate projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Scituate?
A typical commercial Level 2 installation in Scituate energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Scituate take to become profitable?
Payback in Scituate depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.