Install EV Chargers in Somerville, Massachusetts

Install EV chargers or analyze a site in Somerville, Massachusetts. 60 existing public charging locations (4 DC fast, 56 Level 2). Free 0–100 profitability score on any Somerville address from EV Data Map by Charge Rigs.

Somerville, Massachusetts is served by 60 public electric vehicle charging locations operating 176 individual chargers — an average of 2.9 chargers per site. Of those locations, 4 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 56 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Somerville is ChargePoint Network with 49 locations, followed by AMPUP with 3. Average DC fast power across the city is approximately 300 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Somerville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Somerville

Somerville, Massachusetts stands out in the EV charging landscape due to its significant concentration of ChargePoint Network stations, which encompass 82% of the city's 60 public charging locations. This reliance creates a predictable environment for operators, as uptime and pricing dynamics are largely dictated by a single network. The city's 4 DC fast charging sites, averaging an impressive 300 kW and reaching up to 350 kW, cater to the demand for ultra-fast charging. With all DC fast charging stations rated 150 kW or higher, new entrants offering similar power levels will be positioned favorably among EV drivers. Additionally, the majority of charging options are Level 2, reflecting a balanced approach to varying dwell times across Somerville’s diverse community.

Somerville charging by the numbers

Locations
60
Chargers
176
DC Fast locations
4
Level 2 locations
56

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 2.9. Average DC fast power: 300 kW.

Somerville charging — local snapshot

Top operator share
ChargePoint Network runs 82% of public locations across 8 networks.
Average DC fast power
300 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 60 locations
Estimated DC ports
25 fast-charging ports city-wide

Charging networks in Somerville

The following operators run public charging in Somerville, ranked by number of locations.

Featured charging locations in Somerville

A selection of higher-power public charging locations across Somerville, sorted by power level.

  1. Twin City Plaza — Somerville, MA, 02143 (eVgo Network · DC Fast · 350 kW)
  2. Federal Realty - Assembly Row (Somerville, MA) — Somerville, MA, 02145 (Electrify America · DC Fast · 350 kW)
  3. Stop & Shop - Tesla Supercharger — Somerville, MA, 02145 (Tesla · DC Fast · 250 kW)
  4. Stop and Shop Supermarket - Tesla Supercharger — Somerville, MA, 02145 (Tesla · DC Fast · 250 kW)
  5. Alloy Somerville — Somerville, MA, 02145 (EVGATEWAY · Level 2 · 19.2 kW)
  6. Cambria Boston-Somerville — Somerville, MA, 02143 (Blink Network · Level 2 · 11.5 kW)
  7. SOMERVILLE MA CITY HALL 2 — Somerville, MA, 02143 (ChargePoint Network · Level 2 · 9.6 kW)
  8. 200 Inner Belt — Somerville, MA, 02143 (FLO · Level 2 · 7.2 kW)
  9. Montaje Garage - Federal Realty — Somerville, MA, 02145 (AMPUP · Level 2 · 7.2 kW)
  10. Eastside Place — Somerville, MA, 02145 (AMPUP · Level 2 · 7.2 kW)
  11. 100 Chestnut Street — Somerville, MA, 02143 (AMPUP · Level 2 · 7.2 kW)
  12. SOMERVILLE MA TEELE ST1 — Somerville, MA, 02144 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Somerville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 56 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Somerville, Massachusetts?
There are 60 public electric vehicle charging locations in Somerville, Massachusetts, with a combined 176 individual chargers. 4 locations offer DC fast charging and 56 provide Level 2 charging.
What is the largest EV charging network in Somerville?
ChargePoint Network operates the most public charging locations in Somerville with 49 sites, followed by AMPUP with 3 sites.
How much does it cost to install an EV charger in Somerville?
Level 2 EV chargers in Somerville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Somerville?
Most Somerville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Somerville?
A typical commercial Level 2 installation in Somerville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Somerville take to become profitable?
Payback in Somerville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.