Install EV Chargers in Medford, Massachusetts

Install EV chargers or analyze a site in Medford, Massachusetts. 33 existing public charging locations (5 DC fast, 28 Level 2). Free 0–100 profitability score on any Medford address from EV Data Map by Charge Rigs.

Medford, Massachusetts is served by 33 public electric vehicle charging locations operating 83 individual chargers — an average of 2.5 chargers per site. Of those locations, 5 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Medford is ChargePoint Network with 27 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 295 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Medford and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Medford

Medford, Massachusetts, presents a unique landscape for EV charging, primarily dominated by the ChargePoint Network, which operates 82% of the city's 33 public locations. This concentration on a single operator not only affects pricing and reliability but also ensures a consistent user experience. With 15% of Medford's charging spots offering DC fast charging, and all five locations exceeding 150 kW, the city boasts a competitive charging infrastructure that can cater to rapid charging needs. The average power of 295 kW, complemented by a peak of 350 kW, positions new entrants to capitalize on a high-demand segment. The local charging mix accommodates various driver preferences, making it essential for developers to analyze Medford's EV footprint in conjunction with nearby cities for strategic site planning.

Medford charging by the numbers

Locations
33
Chargers
83
DC Fast locations
5
Level 2 locations
28

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 2.5. Average DC fast power: 295 kW.

Medford charging — local snapshot

Top operator share
ChargePoint Network runs 82% of public locations across 5 networks.
Average DC fast power
295 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 33 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Medford

The following operators run public charging in Medford, ranked by number of locations.

Featured charging locations in Medford

A selection of higher-power public charging locations across Medford, sorted by power level.

  1. Wellington Circle Plaza — Medford, MA, 02155 (eVgo Network · DC Fast · 350 kW)
  2. Ocean State Job Lot - Tesla Supercharger — Medford, MA, 02155 (Tesla · DC Fast · 325 kW)
  3. SENTRYFORD PL2 — Medford, MA, 02155 (ChargePoint Network · DC Fast · 320 kW)
  4. SENTRYFORD PL1 — Medford, MA, 02155 (ChargePoint Network · DC Fast · 320 kW)
  5. SENTRYFORD PL3 — Medford, MA, 02155 (ChargePoint Network · DC Fast · 160 kW)
  6. Wellington Woods Condominiums — Medford, MA, 02155 (Blink Network · Level 2 · 13 kW)
  7. SENTRYFORD CPF50-2 — Medford, MA, 02155 (ChargePoint Network · Level 2 · 12 kW)
  8. Raising Canes - Store 940 (XQ) — Medford, MA, 02155 (Blink Network · Level 2 · 11.3 kW)
  9. Wellington Woods 2 — Medford, MA, 02155 (Blink Network · Level 2 · 10.4 kW)
  10. MEDFORD DPW — Medford, MA, 02155 (ChargePoint Network · Level 2 · 9.6 kW)
  11. AC Hotel by Marriott Boston North — Medford, MA, 02155 (LOOP · Level 2 · 7.7 kW)
  12. MEDFORD WEST MEDFORD — Medford, MA, 02155 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Medford specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Medford, Massachusetts?
There are 33 public electric vehicle charging locations in Medford, Massachusetts, with a combined 83 individual chargers. 5 locations offer DC fast charging and 28 provide Level 2 charging.
What is the largest EV charging network in Medford?
ChargePoint Network operates the most public charging locations in Medford with 27 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Medford?
Level 2 EV chargers in Medford typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Medford?
Most Medford projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Medford?
A typical commercial Level 2 installation in Medford energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Medford take to become profitable?
Payback in Medford depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage