Install EV Chargers in Malden, Massachusetts

Install EV chargers or analyze a site in Malden, Massachusetts. 36 existing public charging locations (1 DC fast, 35 Level 2). Free 0–100 profitability score on any Malden address from EV Data Map by Charge Rigs.

Malden, Massachusetts is served by 36 public electric vehicle charging locations operating 90 individual chargers — an average of 2.5 chargers per site. Of those locations, 1 (3%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 35 (97%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Malden is ChargePoint Network with 31 locations, followed by RED_E with 2. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Malden and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Malden

In Malden, Massachusetts, the public EV charging landscape is characterized by a strong reliance on the ChargePoint Network, which operates 86% of the city's 36 public charging locations. This concentration places significant importance on the performance and pricing of this single operator, which may influence a developer's strategy for new charging infrastructure. With only 3% of locations offering DC fast charging at an average output of 120 kW, there is an opportunity for growth in higher-powered stations, as most existing options do not meet the 150 kW or above benchmark. As EV drivers increasingly seek faster charging options, new entrants could capitalize on this gap, particularly in a city where Level 2 options dominate.

Malden charging by the numbers

Locations
36
Chargers
90
DC Fast locations
1
Level 2 locations
35

DC fast share: 3% of locations. Level 2 share: 97%. Average chargers per site: 2.5. Average DC fast power: 120 kW.

Malden charging — local snapshot

Top operator share
ChargePoint Network runs 86% of public locations across 5 networks.
Average DC fast power
120 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
3% DC fast / 97% Level 2 across 36 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Malden

The following operators run public charging in Malden, ranked by number of locations.

Featured charging locations in Malden

A selection of higher-power public charging locations across Malden, sorted by power level.

  1. Malden Catholic High — Malden, MA, 02148 (RED_E · DC Fast · 120 kW)
  2. First Church of Nazarene Malden — Malden, MA, 02148 (RED_E · Level 2 · 9.6 kW)
  3. Point at 180 Malden — Malden, MA, 02148 (AMPUP · Level 2 · 7.2 kW)
  4. CITY OF MALDEN CBD GARAGE 5 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  5. CITY OF MALDEN EARLY LEARN 2 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  6. MALDEN GARDENS STATION 1 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  7. CITY OF MALDEN PUBLIC WORKS 2 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MALDEN GARDENS STATION 3 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MALDEN GARDENS STATION 5 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY OF MALDEN EARLY LEARN 3 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY OF MALDEN JACKSON GAR 3 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITY OF MALDEN JACKSON GAR 4 — Malden, MA, 02148 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Massachusetts we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Malden specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 35 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Malden, Massachusetts?
There are 36 public electric vehicle charging locations in Malden, Massachusetts, with a combined 90 individual chargers. 1 locations offer DC fast charging and 35 provide Level 2 charging.
What is the largest EV charging network in Malden?
ChargePoint Network operates the most public charging locations in Malden with 31 sites, followed by RED_E with 2 sites.
How much does it cost to install an EV charger in Malden?
Level 2 EV chargers in Malden typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Malden?
Most Malden projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Massachusetts state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Malden?
A typical commercial Level 2 installation in Malden energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Malden take to become profitable?
Payback in Malden depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage