Install EV Chargers in Holly, Michigan

Install EV chargers or analyze a site in Holly, Michigan. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any Holly address from EV Data Map by Charge Rigs.

Holly, Michigan is served by 11 public electric vehicle charging locations operating 34 individual chargers — an average of 3.1 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Holly is RED_E with 6 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 136 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Holly and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Holly

Holly, Michigan, features a competitive public charging landscape with 11 locations operated by five distinct networks, led by RED_E at 55% of sites. This variety enables drivers to choose charging options based on power and amenities rather than relying on a single brand. The two DC fast charging stations average a solid 136 kW, with half operating at 150 kW or higher, which places Holly in a favorable mid-power range for fast charging. As new higher-capacity stations enter the market, they will be essential in meeting increased demand, especially given the city's balanced mix of DC fast and Level 2 options. Overall, Holly’s charging infrastructure supports both quick stops and longer dwell times, making it an attractive location for EV drivers navigating the area.

Holly charging by the numbers

Locations
11
Chargers
34
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 3.1. Average DC fast power: 136 kW.

Holly charging — local snapshot

Top operator share
RED_E runs 55% of public locations across 5 networks.
Average DC fast power
136 kW (fastest stall: 151 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Holly

The following operators run public charging in Holly, ranked by number of locations.

Featured charging locations in Holly

A selection of higher-power public charging locations across Holly, sorted by power level.

  1. State Electric Company — Holly, MI, 48442 (RED_E · DC Fast · 151 kW)
  2. Szott Ford Holly MI — Holly, MI, 48442 (RED_E · DC Fast · 120 kW)
  3. JP OSullivan — Holly, MI, 48442 (RED_E · Level 2 · 19.2 kW)
  4. Aaron Genshaw Park — Holly, MI, 48442 (FLO · Level 2 · 19.2 kW)
  5. 302 N Saginaw — Holly, MI, 48442 (FLIPTURN · Level 2 · 12.5 kW)
  6. Seven Lakes State Park — Holly, MI, 48442 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  7. Maple St Holly — Holly, MI, 48442 (RED_E · Level 2 · 9.6 kW)
  8. Broad St Holly — Holly, MI, 48442 (RED_E · Level 2 · 9.6 kW)
  9. RHL Group — Holly, MI, 48442 (RED_E · Level 2 · 9.6 kW)
  10. Holly Oaks ORV Park — Holly, MI, 48442 (Non-Networked · Level 2 · 7.2 kW)
  11. Consumers Energy Groveland Service Center — Holly, MI, 48442 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Holly specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Holly, Michigan?
There are 11 public electric vehicle charging locations in Holly, Michigan, with a combined 34 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Holly?
RED_E operates the most public charging locations in Holly with 6 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Holly?
Level 2 EV chargers in Holly typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Holly?
Most Holly projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Holly?
A typical commercial Level 2 installation in Holly energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Holly take to become profitable?
Payback in Holly depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage