Install EV Chargers in Novi, Michigan

Install EV chargers or analyze a site in Novi, Michigan. 24 existing public charging locations (4 DC fast, 20 Level 2). Free 0–100 profitability score on any Novi address from EV Data Map by Charge Rigs.

Novi, Michigan is served by 24 public electric vehicle charging locations operating 68 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Novi is ChargePoint Network with 13 locations, followed by RED_E with 7. Average DC fast power across the city is approximately 144 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Novi and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Novi

Novi boasts a diverse public charging landscape, featuring 24 locations operated by five distinct networks, primarily led by ChargePoint Network, which accounts for over half of these sites. This competitive environment not only enhances pricing and reliability but also empowers drivers to choose charging stations based on power levels and amenities rather than brand loyalty. With 17% of the charging locations offering DC fast charging, averaging 144 kW and peaking at 350 kW, the city presents a compelling case for both quick top-ups and longer dwell times. Moreover, the presence of 50% of fast chargers operating at 150 kW or higher positions Novi favorably within the broader EV infrastructure market, making it an appealing choice for drivers in search of efficiency and convenience.

Novi charging by the numbers

Locations
24
Chargers
68
DC Fast locations
4
Level 2 locations
20

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.8. Average DC fast power: 144 kW.

Novi charging — local snapshot

Top operator share
ChargePoint Network runs 54% of public locations across 5 networks.
Average DC fast power
144 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 24 locations
Estimated DC ports
11 fast-charging ports city-wide

Charging networks in Novi

The following operators run public charging in Novi, ranked by number of locations.

Featured charging locations in Novi

A selection of higher-power public charging locations across Novi, sorted by power level.

  1. Walmart 5893 (Novi, MI) — Novi, MI, 48375 (Electrify America · DC Fast · 350 kW)
  2. Cadillac of Novi — Novi, MI, 48375 (RED_E · DC Fast · 151 kW)
  3. Shell Novi — Novi, MI, 48374 (RED_E · DC Fast · 51 kW)
  4. Feldman Chevrolet - Novi — Novi, MI, 48375 (Non-Networked · DC Fast · 25 kW)
  5. MAGNA - NOVI MAGNA2 — Novi, MI, 48375 (ChargePoint Network · Level 2 · 19.2 kW)
  6. MAGNA - NOVI MAGNA1 — Novi, MI, 48375 (ChargePoint Network · Level 2 · 12 kW)
  7. 21580 Novi Road, Suite 300 — Novi, MI, 48375 (EV Connect · Level 2 · 11 kW)
  8. Staybridge Suites Novi — Novi, MI, 48374 (RED_E · Level 2 · 9.6 kW)
  9. Hanon Systems Side EV Lot — Novi, MI, 48377 (RED_E · Level 2 · 9.6 kW)
  10. Hanon Systems Front EV Lot — Novi, MI, 48377 (RED_E · Level 2 · 9.6 kW)
  11. Sakura Novi Residential — Novi, MI, 48375 (RED_E · Level 2 · 9.6 kW)
  12. Novi Public Library — Novi, MI, 48375 (RED_E · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Michigan we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Novi specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Novi, Michigan?
There are 24 public electric vehicle charging locations in Novi, Michigan, with a combined 68 individual chargers. 4 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Novi?
ChargePoint Network operates the most public charging locations in Novi with 13 sites, followed by RED_E with 7 sites.
How much does it cost to install an EV charger in Novi?
Level 2 EV chargers in Novi typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Novi?
Most Novi projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Michigan state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Novi?
A typical commercial Level 2 installation in Novi energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Novi take to become profitable?
Payback in Novi depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.