Install EV chargers or analyze a site in Golden Valley, Minnesota. 11 existing public charging locations (1 DC fast, 10 Level 2). Free 0–100 profitability score on any Golden Valley address from EV Data Map by Charge Rigs.
Golden Valley, Minnesota is served by 11 public electric vehicle charging locations operating 47 individual chargers — an average of 4.3 chargers per site. Of those locations, 1 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Golden Valley is ChargePoint Network with 5 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Golden Valley and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Golden Valley
Golden Valley features a competitive public EV charging landscape with 11 locations operated by five distinct networks, primarily dominated by ChargePoint Network at 45%. This diversity allows drivers to prioritize specific charging speeds and amenities over brand loyalty, with just one DC fast charger averaging 50 kW—an indication of an older infrastructure. Although 9% of charging sites offer DC fast options, they fall short of contemporary standards as the fastest station is capped at 50 kW. For drivers, this means navigating a mix of charging options while considering that many nearby cities may offer higher-output stations beyond Golden Valley's current capabilities.
Golden Valley charging by the numbers
Locations
11
Chargers
47
DC Fast locations
1
Level 2 locations
10
DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 4.3. Average DC fast power: 50 kW.
Golden Valley charging — local snapshot
Top operator share
ChargePoint Network runs 45% of public locations across 5 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 11 locations
Estimated DC ports
1 fast-charging ports city-wide
Charging networks in Golden Valley
The following operators run public charging in Golden Valley, ranked by number of locations.
ChargePoint Network — 5 locations
Blink Network — 2 locations
Tesla Destination — 2 locations
EV Connect — 1 location
Non-Networked — 1 location
Featured charging locations in Golden Valley
A selection of higher-power public charging locations across Golden Valley, sorted by power level.
JIM LUPIENT BUICK GMC — Golden Valley, MN, 55426 (EV Connect · DC Fast · 50 kW)
Audi Minneapolis — Golden Valley, MN, 55426 (Blink Network · Level 2 · 21.6 kW)
HENNEPIN COUNTY GOLDENVALLEYLIB — Golden Valley, MN, 55427 (ChargePoint Network · Level 2 · 11.5 kW)
JLRMINNEAPOLIS SHOP03 — Golden Valley, MN, 55426 (ChargePoint Network · Level 2 · 7.2 kW)
Holiday Inn Express Golden Valley - Tesla Destination — Golden Valley, MN, 55416 (Tesla Destination · Level 2 · 7.2 kW)
AC Marriott — Golden Valley, MN, 55416 (Non-Networked · Level 2 · 7.2 kW)
The Colonnade - Tesla Destination — Golden Valley, MN, 55416 (Tesla Destination · Level 2 · 7.2 kW)
CENTRALGV CENTRAL N — Golden Valley, MN, 55422 (ChargePoint Network · Level 2 · 6.5 kW)
GOLDEN VALLEY CITY HALL — Golden Valley, MN, 55427 (ChargePoint Network · Level 2 · 6.5 kW)
CENTRALGV CENTRAL S — Golden Valley, MN, 55422 (ChargePoint Network · Level 2 · 6.5 kW)
Parking Garage Stall #12 — Golden Valley, MN, 55416 (Blink Network · Level 2 · 6.2 kW)
Nearby cities with EV charging coverage
Other cities in Minnesota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Golden Valley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Golden Valley, Minnesota?
There are 11 public electric vehicle charging locations in Golden Valley, Minnesota, with a combined 47 individual chargers. 1 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Golden Valley?
ChargePoint Network operates the most public charging locations in Golden Valley with 5 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Golden Valley?
Level 2 EV chargers in Golden Valley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Golden Valley?
Most Golden Valley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Minnesota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Golden Valley?
A typical commercial Level 2 installation in Golden Valley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Golden Valley take to become profitable?
Payback in Golden Valley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.