Install EV Chargers in Biloxi, Mississippi

Install EV chargers or analyze a site in Biloxi, Mississippi. 10 existing public charging locations (1 DC fast, 9 Level 2). Free 0–100 profitability score on any Biloxi address from EV Data Map by Charge Rigs.

Biloxi, Mississippi is served by 10 public electric vehicle charging locations operating 37 individual chargers — an average of 3.7 chargers per site. Of those locations, 1 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Biloxi is Tesla Destination with 6 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 50 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Biloxi and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Biloxi

Biloxi’s EV charging landscape is prominently shaped by Tesla Destination, which accounts for 60% of the city’s 10 public locations, significantly influencing the area's charging reliability and pricing structure. The lone DC fast charging station operates at a maximum of 50 kW, reflecting a legacy capability that may deter drivers seeking faster options. Local competition for charging infrastructure is limited, as only 10% of sites offer DC fast options, with the remaining predominantly Level 2 chargers catering to longer-dwell scenarios. For site developers, this presents a strategic opportunity to leverage the absence of higher-capacity charging—particularly 150 kW or greater—to meet growing demand and capitalize on gaps in the existing network.

Biloxi charging by the numbers

Locations
10
Chargers
37
DC Fast locations
1
Level 2 locations
9

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.7. Average DC fast power: 50 kW.

Biloxi charging — local snapshot

Top operator share
Tesla Destination runs 60% of public locations across 3 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 10 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Biloxi

The following operators run public charging in Biloxi, ranked by number of locations.

Featured charging locations in Biloxi

A selection of higher-power public charging locations across Biloxi, sorted by power level.

  1. Bob Boyte Chevrolet — Biloxi, MS, 39532 (RED_E · DC Fast · 50 kW)
  2. IP Casino Resort & Spa High Rollers - Tesla Destination — Biloxi, MS, 39530 (Tesla Destination · Level 2 · 7.2 kW)
  3. DoubleTree by Hilton Hotel Biloxi - Tesla Destination — Biloxi, MS, 39530 (Tesla Destination · Level 2 · 7.2 kW)
  4. IP Casino Resort & Spa - Tesla Destination — Biloxi, MS, 39530 (Tesla Destination · Level 2 · 7.2 kW)
  5. Beau Rivage Resort & Casino - Garage 2nd Floor - Tesla Destination — Biloxi, MS, 39530 (Tesla Destination · Level 2 · 7.2 kW)
  6. Harrah's Gulf Coast - Tesla Destination — Biloxi, MS, 39530 (Tesla Destination · Level 2 · 7.2 kW)
  7. Edgewater Mall - Tesla Destination — Biloxi, MS, 39531 (Tesla Destination · Level 2 · 7.2 kW)
  8. IP Casino Resort & Spa — Biloxi, MS, 39530 (Non-Networked · Level 2 · 7.2 kW)
  9. Golden Nugget Biloxi Hotel & Casino — Biloxi, MS, 39530 (Non-Networked · Level 2 · 7 kW)
  10. Palace Casino Resort — Biloxi, MS, 39530 (Non-Networked · Level 2 · 7 kW)

Nearby cities with EV charging coverage

Other cities in Mississippi we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Biloxi specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Biloxi, Mississippi?
There are 10 public electric vehicle charging locations in Biloxi, Mississippi, with a combined 37 individual chargers. 1 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Biloxi?
Tesla Destination operates the most public charging locations in Biloxi with 6 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Biloxi?
Level 2 EV chargers in Biloxi typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Biloxi?
Most Biloxi projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Mississippi state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Biloxi?
A typical commercial Level 2 installation in Biloxi energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Biloxi take to become profitable?
Payback in Biloxi depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage