Install EV Chargers in Tupelo, Mississippi

Install EV chargers or analyze a site in Tupelo, Mississippi. 14 existing public charging locations (9 DC fast, 5 Level 2). Free 0–100 profitability score on any Tupelo address from EV Data Map by Charge Rigs.

Tupelo, Mississippi is served by 14 public electric vehicle charging locations operating 30 individual chargers — an average of 2.1 chargers per site. Of those locations, 9 (64%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (36%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Tupelo is ChargePoint Network with 9 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 230 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Tupelo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Tupelo

Tupelo, Mississippi, showcases a robust charging infrastructure with 14 public locations, predominantly operated by ChargePoint Network, which manages 64% of the sites. This concentrated network enhances reliability and standardizes the charging experience. Notably, the city stands out for its impressive average DC fast charging power of 230 kW, with all fast chargers rated at 150 kW or more, making them some of the fastest available locally. With approximately 20 DC fast ports distributed across the city, the infrastructure caters well to EV drivers seeking ultra-fast charging options while also addressing Level 2 demand. This unique profile positions Tupelo as an attractive location for new operators aiming to meet growing EV needs effectively.

Tupelo charging by the numbers

Locations
14
Chargers
30
DC Fast locations
9
Level 2 locations
5

DC fast share: 64% of locations. Level 2 share: 36%. Average chargers per site: 2.1. Average DC fast power: 230 kW.

Tupelo charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 5 networks.
Average DC fast power
230 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
64% DC fast / 36% Level 2 across 14 locations
Estimated DC ports
20 fast-charging ports city-wide

Charging networks in Tupelo

The following operators run public charging in Tupelo, ranked by number of locations.

Featured charging locations in Tupelo

A selection of higher-power public charging locations across Tupelo, sorted by power level.

  1. TOMBIGBEE STATION 2 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  2. TOMBIGBEE STATION 1 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  3. UCI SHOP 80065 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  4. TOMBIGBEE STATION 3 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  5. UCI SHOP 801F3 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  6. TOMBIGBEE STATION 4 — Tupelo, MS, 38804 (ChargePoint Network · DC Fast · 250 kW)
  7. Metro Ford Auto Sales — Tupelo, MS, 38804 (FORD_CHARGE · DC Fast · 240 kW)
  8. 1410 South Gloster Street Tupelo, MS 38801 — Tupelo, MS, 38801 (EV Connect · DC Fast · 180 kW)
  9. The Mall at Barnes Crossing - Tesla Supercharger — Tupelo, MS, 38804 (Tesla · DC Fast · 150 kW)
  10. UCI SHOP DELIVERY BAY — Tupelo, MS, 38804 (ChargePoint Network · Level 2 · 12 kW)
  11. BC CPF50 2 — Tupelo, MS, 38804 (ChargePoint Network · Level 2 · 12 kW)
  12. UCI SHOP BACK SHOP — Tupelo, MS, 38804 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Mississippi we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Tupelo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Tupelo, Mississippi?
There are 14 public electric vehicle charging locations in Tupelo, Mississippi, with a combined 30 individual chargers. 9 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in Tupelo?
ChargePoint Network operates the most public charging locations in Tupelo with 9 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in Tupelo?
Level 2 EV chargers in Tupelo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Tupelo?
Most Tupelo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Mississippi state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Tupelo?
A typical commercial Level 2 installation in Tupelo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Tupelo take to become profitable?
Payback in Tupelo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage