Install EV Chargers in Jefferson City, Missouri

Install EV chargers or analyze a site in Jefferson City, Missouri. 11 existing public charging locations (7 DC fast, 4 Level 2). Free 0–100 profitability score on any Jefferson City address from EV Data Map by Charge Rigs.

Jefferson City, Missouri is served by 11 public electric vehicle charging locations operating 40 individual chargers — an average of 3.6 chargers per site. Of those locations, 7 (64%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (36%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Jefferson City is ChargePoint Network with 5 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 143 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Jefferson City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Jefferson City

Jefferson City runs a comparatively competitive public charging market: 7 distinct operators share its 11 locations, with ChargePoint Network the largest at 45% of sites. That diversity tends to keep pricing and uptime competitive but also makes corridor-style site selection more nuanced — drivers in Jefferson City pick on power and amenity rather than defaulting to a single brand. The 7 DC fast locations average 143 kW, with the fastest site at 325 kW. That is a mid-power fleet by current US standards; 29% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 64% of Jefferson City's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 26 DC fast ports across the city. EV Data Map scores any Jefferson City address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Jefferson City charging by the numbers

Locations
11
Chargers
40
DC Fast locations
7
Level 2 locations
4

DC fast share: 64% of locations. Level 2 share: 36%. Average chargers per site: 3.6. Average DC fast power: 143 kW.

Jefferson City charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 7 networks.
Average DC fast power
143 kW (fastest stall: 325 kW)
High-power share
29% of DC fast sites are 150 kW-class or higher
Mix
64% DC fast / 36% Level 2 across 11 locations
Estimated DC ports
26 fast-charging ports city-wide

Charging networks in Jefferson City

The following operators run public charging in Jefferson City, ranked by number of locations.

Featured charging locations in Jefferson City

A selection of higher-power public charging locations across Jefferson City, sorted by power level.

  1. Target - Tesla Supercharger — Jefferson City, MO, 65109 (Tesla · DC Fast · 325 kW)
  2. Rusty Drewing Chevrolet Buick GMC Cadillac — Jefferson City, MO, 65101 (EV Connect · DC Fast · 180 kW)
  3. H3 QOZB MARRIOTTJC DC1 — Jefferson City, MO, 65101 (ChargePoint Network · DC Fast · 125 kW)
  4. H3 QOZB MARRIOTTJC DC2 — Jefferson City, MO, 65101 (ChargePoint Network · DC Fast · 125 kW)
  5. Joe Machens Capital City Ford — Jefferson City, MO, 65109 (SYNERGEV · DC Fast · 120 kW)
  6. CENTRAL BANK 01-CTB MOTOR B — Jefferson City, MO, 65101 (ChargePoint Network · DC Fast · 62.5 kW)
  7. CENTRAL BANK 01-CTB MOTOR A — Jefferson City, MO, 65101 (ChargePoint Network · DC Fast · 62 kW)
  8. Jefferson City — Jefferson City, MO, 65109 (NOODOE · Level 2 · 10 kW)
  9. Joe Machens Capital City Ford — Jefferson City, MO, 65109 (Non-Networked · Level 2 · 7.2 kW)
  10. Culver's of Jefferson City - Tesla Destination — Jefferson City, MO, 65109 (Tesla Destination · Level 2 · 7.2 kW)
  11. H3 QOZB MARRIOTTJC L2 — Jefferson City, MO, 65101 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Missouri we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Jefferson City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 4 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Jefferson City, Missouri?
There are 11 public electric vehicle charging locations in Jefferson City, Missouri, with a combined 40 individual chargers. 7 locations offer DC fast charging and 4 provide Level 2 charging.
What is the largest EV charging network in Jefferson City?
ChargePoint Network operates the most public charging locations in Jefferson City with 5 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Jefferson City?
Level 2 EV chargers in Jefferson City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Jefferson City?
Most Jefferson City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Missouri state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Jefferson City?
A typical commercial Level 2 installation in Jefferson City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Jefferson City take to become profitable?
Payback in Jefferson City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage