Install EV Chargers in St. Peters, Missouri

Install EV chargers or analyze a site in St. Peters, Missouri. 19 existing public charging locations (8 DC fast, 11 Level 2). Free 0–100 profitability score on any St. Peters address from EV Data Map by Charge Rigs.

St. Peters, Missouri is served by 19 public electric vehicle charging locations operating 33 individual chargers — an average of 1.7 chargers per site. Of those locations, 8 (42%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (58%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in St. Peters is ChargePoint Network with 11 locations, followed by Blink Network with 6. Average DC fast power across the city is approximately 87 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in St. Peters and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in St. Peters

St. Peters, Missouri, offers a balanced EV charging landscape with 19 public locations, including a noteworthy 42% fast charging share. While the average power of the 8 DC fast chargers is 87 kW, the presence of the 350 kW stall highlights potential for rapid charging in key areas. ChargePoint Network dominates with 58% of the sites, creating a reliable choice for drivers. However, with only 13% of fast chargers rated at 150 kW or higher, St. Peters sits at an interesting crossroads; there's room for growth to meet increasing demand for higher-capacity charging. The mix of DC fast and Level 2 chargers positions the city strategically to cater to varying driver needs, signaling opportunities for smart growth in the EV infrastructure ecosystem.

St. Peters charging by the numbers

Locations
19
Chargers
33
DC Fast locations
8
Level 2 locations
11

DC fast share: 42% of locations. Level 2 share: 58%. Average chargers per site: 1.7. Average DC fast power: 87 kW.

St. Peters charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 4 networks.
Average DC fast power
87 kW (fastest stall: 350 kW)
High-power share
13% of DC fast sites are 150 kW-class or higher
Mix
42% DC fast / 58% Level 2 across 19 locations
Estimated DC ports
13 fast-charging ports city-wide

Charging networks in St. Peters

The following operators run public charging in St. Peters, ranked by number of locations.

Featured charging locations in St. Peters

A selection of higher-power public charging locations across St. Peters, sorted by power level.

  1. CBL Mid Rivers Mall (St Peters, MO) — St Peters, MO, 63376 (Electrify America · DC Fast · 350 kW)
  2. SCH5701 SCH5701LEV3N — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 62.5 kW)
  3. NAPLETON HONDA PARKING LOT — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 62.5 kW)
  4. SCH5701 SCH5701LEV3S — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 62.5 kW)
  5. SCH5701 GENNORTH — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Saint Charles Nissan — St. Peters, MO, 63376 (Non-Networked · DC Fast · 50 kW)
  7. BOMMARITO VW BVW-ISLAND2 — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 24 kW)
  8. BOMMARITO VW BVW-ISLAND1 — St. Peters, MO, 63376 (ChargePoint Network · DC Fast · 24 kW)
  9. OBE EMBASSY SCHAR R — St. Peters, MO, 63303 (ChargePoint Network · Level 2 · 13.4 kW)
  10. SCH5701 NEW CAR — St. Peters, MO, 63303 (ChargePoint Network · Level 2 · 12 kW)
  11. Building 4 Reserve Mid Rivers Apartments — St. Peters, MO, 63304 (Blink Network · Level 2 · 7.2 kW)
  12. Building 23 Reserve Mid Rivers — St. Peters, MO, 63304 (Blink Network · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Missouri we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For St. Peters specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in St. Peters, Missouri?
There are 19 public electric vehicle charging locations in St. Peters, Missouri, with a combined 33 individual chargers. 8 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in St. Peters?
ChargePoint Network operates the most public charging locations in St. Peters with 11 sites, followed by Blink Network with 6 sites.
How much does it cost to install an EV charger in St. Peters?
Level 2 EV chargers in St. Peters typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in St. Peters?
Most St. Peters projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Missouri state, utility and NEVI-funded programs.
How long does it take to install an EV charger in St. Peters?
A typical commercial Level 2 installation in St. Peters energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in St. Peters take to become profitable?
Payback in St. Peters depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage